Baseline for Blow-out Fixtures

CS-2009 WEp1:Water Use Reduction
posted by  study topenergy  on 

According to the Water Use Reduction Additional Guidance (April 2013), when selecting the "Blow-out fixture" option, the 3.5 gpf baselne should also be used for the installed case.

1
Mon Nov 30, 2015, 10:53 pm

Non recyclables in recycling stream

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Vanessa Seibert  on 

I think I know the answer but just want to double check.

1
Tue Mar 24, 2015, 8:04 pm

Parking space ownership

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Gustavo De las Heras Izquierdo  on 

I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?

1
Thu Mar 26, 2015, 1:10 am

Parking spaces owned

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Gustavo De las Heras Izquierdo  on 

I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual buyers?

0

Credit Complance/Justification in Spanish

General forums
posted by  Peter Gibney  on 

For justifiying compliance with LEED credits for a Project in Spain, can supporting documentation, management plans, etc.

1
Wed Jan 20, 2016, 3:18 am

Target Finder: Design vs Target

NC-2009 EAp2:Minimum Energy Performance
posted by  Rock Ridolfi  on 

All, new to energy modeling and reviewing the EAp2 online template trying to figure out the required inputs and reports for the Target Finder section, Design vs Target.

1
Thu Mar 26, 2015, 12:44 am

LEED "Owner" (vs. Leasing)

Retail-NC-v2009 PIf3:Occupant and Usage Data
posted by  Serena Wray  on 

I am working with a national retailer who controls the design of their own stores and all LEED decisions that are made regarding those stores.

1
Wed Mar 23, 2016, 4:17 am

Total material cost

NC-2009 MRc5:Regional Materials
posted by  Sahar Abi-Ziki  on 

Hello, In our project, we decided to estimate real total material cost without equipments and labor for division 2-10. What kind of proof the contractor needs to present in this case?

1
Fri Nov 27, 2015, 7:41 pm

Location(s) and Wording of Signs

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Haley Duncan  on 

I'd like a little more clarity on "posting information regarding the building's nonsmoking policy in prominent locations throughout the building." We are a winery with a production facility, offi

1
Wed Mar 25, 2015, 8:53 pm

LEFEV Parking spots in shared garage w/ no dedicated spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  ELIZABETH REITER  on 

Regarding Option 1 of providing preferred parking for LEFEV for 5% of the total vehicle parking capacity of the site. Here is our issue/question.

1
Mon Aug 10, 2015, 7:27 pm