Healthcare-v2009 MRp1:Storage and collection of recyclablesposted by Crina Bosch on
Does anyone know if LEED specifies what types of batteries need to be recycled?
Where are PIf3-1 forms now?
NC-2009 PIf3:Occupant and Usage Dataposted by Susan Di Giulio on
Hi, I feel dumb asking this but where are the LEED-NC v2009 PI3-1 forms for calculating occupancy located in the new interface?
Warehouse with office space
EBOM-2009 PIf3:Occupant and Usage Dataposted by Saul Pichardo, AIA on
I am working on a warehouse/distribution project that has approx. 200,000 sf warehouse/ distribution space with a 6,444 sf office that supports the warehouse operations.
ESC Plan and Project LEED Boundary in Campus project
NC-2009 SSp1:Construction Activity Pollution Preventionposted by soha yamani on
we are working on a campus LEED project that have four different contractors working on four different buildings that will be registered for LEED as individual projects under campus project now so
ammonia-based fertilizers
Schools-EBOM-v4 SSc5:Site managementposted by R. Ted Krasnesky on
Can fertilizers contain a small percentage of Ammoniacal Nitrogen and still be considered non-ammonia based?
Feedback from GBCI
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Mara Baum on
I received some feedback from GBCI that is specific to a project, but that I think will be broadly applicable and may help to answer some of the questions below.
Fraction use of FSC materials
NC-2009 MRc7:Certified Woodposted by Lilian Seow on
This question and answer come from above and Missing Manual: A product has FSC-certified veneer, but a non-certified core. Can we prorate the MRc7 contribution of this product based on the cost of
Energy model
CS-2009 EAp2:Minimum Energy Performanceposted by gabriel Morales on
Is it possible to model the building on Energy Plus and the underground parking lot calculation do it by extraordinary calculations? Also if it is a mixed use building, is it possible to model the
PI Form4 - Lease Requirement
CI-2009 PIf4:Schedule and Overview Documentsposted by Ludmilla Pavlova-Gillham on
My University (12M GSF, 13 divisions, 54 major business units, over 250 major departments), has a multi-use building (287,000) that is undergoing a commercial retail renovation on the ground floor
CONCORE Raised Access Floor Panel.
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Carla Lopez on
Dear all, Does raised floor must meet the FloorScore requirements? We'll be using CONCORE Raised Access Floor Panel; the product comes laminated. Its % Volatile by Volume equals 0%; it does not own