Forum quick links
When your manufacturer doesnt have SRI values
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin D. on
In regards to this credit the LEED REFERENCE GUIDE FOR BUILDING DESIGN & CONSTRUCTION WITH GLOBAL ALTERNATIVE COMPLIANCE PATHS for LEED 2009 says that "Projects outside the U.S.
Chiller Minimum Equipment Efficiency nonstandard conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Adriana Hansen on
The project team has specified a centrifugal chiller of over 600 Tons with a nonstandard conditions. It has been sent an AHRI certificate showing the compliance with ASHREA 90.1-2007 and 2010.
LEED VOLUME for Core & Shell in v4 available?
posted by Marco Abdallah on
Hi, we are going to certify a businesspark consisting 30 buildings of the same type under LEED C&S in v4.
Blinds
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Mike D on
If blinds are installed, are the views calculations affected?
About exemplary performance credit (ID) in design appeal process
posted by Jorng-ren Chern on
Currently we are preparing appeal process for a project. We found a WE credit can earn Innovation in Design (ID) credit for exemplary performance after improvement and performing calculation.
Zero-Waste program vs separate programs for food and e-waste
NC-2009 IDc1:Innovation in Designposted by Susan Di Giulio on
Hi, We are working with some great clients in a city anxious to test-drive a zero-waste program. We have 2 CI-2009 projects with these clients.
Initial Questions about LEED O+M
EBOM-2009 PIf3:Occupant and Usage Dataposted by S. M. on
Hi all, We got a request from a building owner recently.
Commissioning with Volume Build Projects
Retail-CI-v4 EAp1:Fundamental commissioning and verificationposted by Robin Dukelow on
I am in the process of verifying the Cx requirements for Volume Build Projects.
Buried crushed concrete
NC-2009 MRc3:Materials Reuseposted by Maria Isabel Conde on
We are demolishing an existing building. The team is considering burying the concrete, without this being used as fill for the new building. Could this account for the MRC2? Thanks,
SSc8 and EAc1 Disconnect?
Schools-2009 EAc1:Optimize Energy Performanceposted by Amalia Hicks on
For LEED v3 (2009) SSc8 - Light Pollution Reduction, the baseline exterior lighting power allowance uses ASHRAE 90.1-2007 Addendum i (which has similar values to 90.1-2010).