Forum quick links
Prescriptive EnergyEfficiency nApproach
NC-2009 EAc1:Optimize Energy Performanceposted by J.R. Anderson on
The LEED 2009 v does not specify the level of efficiency for a small office / mixed use building. Only AEDG 2004 is shown specified.
Stairwells in APPA audit? And mechanical rooms?
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Helen Samuel on
I am looking for guidance on how to count stairwells in the APPA Custodial audit. We have 3 stairwells, and 10 floors. Case A: Does each stairwell count as a single "room"?
Building a Library next to a School
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Krysta Dimick on
Can a school bus line count as our additional transportation line?
Interior Living Wall & it's associated drip irrigation
posted by Lilian Seow on
Is the interior living wall and its' associated drip irrigation considered as an interior plants/planter in division 12?
Pergola covering the mechanical equipment
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Alicja Bieszyńska on
The mechanical equipment located on the roof of my project is covered by a metal pergola/blinds only for the esthetics.
High Rise Building with 120+ AHUs
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Mark Daub on
Hi, Im working on a project in Germany that consists of two high rise buildings with 30 floors each. Each floor is devided into 2 Zones.
Compliance for the horizontal view at 42”
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Aditya Chemburkar on
For a CS Project, the tentative floor layout for the office space has been designed.
Solar service hot water system
NC-2009 EAp2:Minimum Energy Performanceposted by Rosana Correa on
Hi, The service water system in this building is heated by solar thermal collectors only, with no secondary heating system.
Expected Volume - Acceptable Estimates
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Lara Schneider on
What have you all determined to be an acceptable expected recycling volume estimate for this credit?
Submitting a new credit after final construction review
posted by Gaston Michaud on
Hello everyone, We just received the final construction review, and found out that our project got 59 points awarded.