Forum quick links
Shared Multi-Occupant Controls Tables IEQc6.1-2 and IEQc6
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jennifer Martin on
On Shared Multi-Occupant Controls Tables IEQc6.1-2 and IEQc6,what data is entered in Column: # of Spaces with Controls.
Six assemblies or five for Option 2?
NC-v4 EQc2:Low emitting materialsposted by Nadav Malin on
Under Option 2, the credit language says "The budget method organizes the building interior into six assemblies:" but then proceeds to list only five. Anyone know what the sixth is?
Conference room
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I’m modelling a school in which a conference room is going to be placed. The baseline shall be System 5 - Packaged VAV with reheat.
LEED Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Sasha Peters on
We are currently working for a LEED project which is spread across the project plot area with two office buildings (one “Administrative”- and the other “General”), three warehouses (all unconditio
Calculation error
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Magda Aghababyan on
Hi, Do we have to count the number of absentees in to the total number of regular occupants responded to the survey?
Problem with Fan Power input for System 6
CS-2009 EAp2:Minimum Energy Performanceposted by Morteza Kasmaei on
Dear Experts, I am straggling to input Fan Power in the baseline model (System 6 - Packaged VAV with PFP Boxes) and have the following issues: 1- In Table 1.4.6 - General HVAC, there is a note f
Classroom Entrances
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Eddie Cuevas on
I am working on a project located on a college campus. The project building features an exposed atrium located in the center of the building.
campus energy - pieces of the pie
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
On our campus AG projects, We have a central plant providing energy for 6 buildings. Only three of the buildings are LEED projects.
ESC plan language
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aldo Pazo on
Hello everybody. Can we submitt in LEED Online our ESC Plan in other language different than English? for example in Spanish? Thank you!
Option 1 - Projects with Internal Streets
ND-v2009 NPDp3:Connected and open communityposted by Michael Smithing on
Our project is a mixed use office/retail/park development with only one internal street crossing the site. In determining whether to apply Option 1 or Option 2 to our project, it appears that the