Forum quick links
Default Occupancy and WEp1
NC-2009 PIf3:Occupant and Usage Dataposted by mary ostafi on
I am working on a LEED-CS 2009 project that is half office and half lab space. Not all of the tenants are certain yet so we opted to select the 'default occupancy' option.
Indoor Turf
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Martha Norbeck on
Does anyone have any experience with a compliant indoor turf flooring? Thanks!
LEED v4-Credits MR-USGBC approved program
posted by Paola Moschini on
Dear all, about MRc3 in LEED v4, could I have more information or links where can I find more information especially about USGBC approved program? Thank you in advance!
Water Efficiency in Industrail Projects
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Steve Beck on
We are constructing a large expansion to a dairy products manufacturing plant which the owner desires to certify.
emergency Stairs
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Omar Elrawy on
I have an emergency staircase, which won't be used except in case of fire, and this staircase (core) is completely separate from the building's HVAC system, with an exhaust fan only, without any Ai
retention basin and infiltration on site
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Adrienn Gelesz on
I am a little confused: The reference guide states that average TSS removal of an infiltration basin is 75% (50-100%).
Occupant feedback
EBOM-2009 IEQp3:Green Cleaning Policyposted by Sheryl Swartzle on
The sample cleaning policy under "documents toolkit" section 15 states all "guest and employees" shall have a mechanism by which to provide feedback on cleaning practices.
How many signs are required for preferred parking?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Susan Di Giulio on
I am working on a project in California. CALGreen, the state green building code section, requires that a certain number of parking stalls be designated as "CLEAN AIR" spaces.
Provision of bus schedules as evidence
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Rebecca Hart on
We are pursuing the exemplary performance element of this credit, as the site is extremely well served by bus routes (just counting the main bus lines, we have over 706 compliant bus rides/day).