Forum quick links
Can I to charge bicycle parking?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by nathalie monory on
Hello everybody My client charging the car park entrance, and he would like to do a same for parking bicycles. I know that the showers should be available for free, but what about for the bike rack
private minibus VS shuttle
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Adrienn Gelesz on
Hi, does any one know if there is any difference in a "shuttle" and a "private minibus"? Are these term interchangable?
CO2 sensors in future spaces
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Saju Varghese on
We are currently doing a university building shared by two schools. Thus some of the areas of the bldg are to be develope in the future.
LEED certification for identical buildings
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi All, We have a project coming up where LEED certification is being pursued for multiple identical villas. How does USGBC treat such a project.
LEED v4 Homes
posted by Alicia Villanueva on
The new LEED v4 is intended to be fully applicable in projects outside the US. I have navigated through the new LEED for Homes v4 credits but I have not found yet how the new rating system will be
WEp1 fixture group for bicyclists
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jaclyn Whitaker on
Does anyone have experience with including a bicyclist fixture group for 5% of the project's FTE (and Peak Transients) for showers (1 shower per day per FTE for this bicyclist fixture group) rather
Paint VoC content certification
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Magda Aghababyan on
Hello, We did a paint VoC test with an independent party for a type of paint that one of our client is using (because the manufacturer didn't have technical documentation to provide us).
List energy end uses
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Mike D on
"The M and V Plan omits the table or listing of the project’s energy end uses as required by the form." However, the Plan we have submitted lists the following: Locations and types of energy meter
Innovation Credit: Electric charge stations
EBOM-2009 IOc1:Innovation in Operationsposted by Mike Stopka on
Has anyone ever pursued an innovation & design credit with charging stations? A project I am working on is looking to install 6 stations on site and promote/market them
PIf3 Default Occupancy
posted by mary ostafi on
I am working on a LEED-CS 2009 project that is half office and half lab space. Not all of the tenants are certain yet so we opted to select the 'default occupancy' option.