Planned Transfer Center

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Josh Mauldin  on 

My project is a fire station that is the first project on the site of a mixed use development. A bus transfer center is planned to be built directly across from the fire station.

0

Section 1.4: Mechanical System Design Criteria

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Nick Chiarelli  on 

If I could get some clarification on this section it would be a huge help! Total project space load (heating and cooling): Is this the sum of all seperate max space loads or is this the load of th

0

Crawl space included in GSF? Interior courtyards?

NC-2009 PIf2:Project Summary Details
posted by  Michael Wironen  on 

We have a fairly complicated building project that includes two areas that are unclear to me as to whether they should be included in the gross floor area calculation: 1.

1
Thu Jun 6, 2013, 5:38 pm

Serving all occupants

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Jennifer Benedict  on 

I am building a new tower right next to an old tower, connected by an existing parking garage. Our LEED boundary is just the new construction.

1
Fri Jul 12, 2013, 8:37 pm

100% OA VAVs

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Jeremy Kuhre  on 

We are remodeling two floors of a high-rise office tower. A 100% OA VAV introduces OA into the mechanical room for each floor where it is mixed with return air.

1
Mon Jun 3, 2013, 7:17 pm

Cooling Tower Submetering

NC-2009 EAc5:Measurement and Verification
posted by  Saju Varghese  on 

Under the reference guide, it is requiring for process water to be submetered, which according to the glossary involves cooling tower water, boilers and chillers, but if the cooling tower is servi

1
Mon Jun 3, 2013, 8:44 pm

Tables not displaying

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Nelina Loiselle  on 

The tables (1-4) referenced in the Credit Language tab do not display. Please advise. Thank you!

1
Tue Jul 9, 2013, 9:42 pm

Gym Memberships and shower access for C&S

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Robyn Vettraino  on 

The FTE Occupants on the project is 123, and therefore 1 shower should be required in my opinion. The project secured a complete gym membership for 1 full time employee on the Project.

1
Tue Jun 4, 2013, 12:11 am

Tile Crack Prevention Underlay

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  L W  on 

Does tile crack prevention mat underlay (with a polyurethane self-adhesive ) have to meet FloorScore standard for C&S Project?

1
Fri Jun 21, 2013, 2:19 pm

Case 2 Calculator - Space Types

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Timothy Casper  on 

Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices).

1
Fri Jun 21, 2013, 1:05 am