We are remodeling two floors of a high-rise office tower. A 100% OA VAV introduces OA into the mechanical room for each floor where it is mixed with return air. An AHU in each mechanical room distributes the mixed air to the floor using a VAV system. With this arrangement, I want to confirm that installing an air flow monitor on the two OA VAVs (or simply showing that the fan is "on" per LIR #2099) and installing CO2 sensors in all densely occupied spaces fulfill the monitoring requirements of this credit.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.