Forum quick links
Ceiling credit
CI-2009 IDc1:Innovation in Designposted by Tarek on
now we are working on project Commercial interior in Egypt ,As you know that there is no credit related to ceiling , 80% of building was used the false ceiling and this ceiling was Meets CA Dept.
CX EBOM EAc2.1
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Katherine Phelps on
Looking for a Building commissioning service provider in Southern Massachusetts.
Contract service use of equipment
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Kay Sieck on
Do I need to get a list of the powered equipment used by our contract service that is used on site for landscape management such as lawn mowers and leaf blowers?
Building recessed into hill/mountain
NC-2009 EAc1:Optimize Energy Performanceposted by Anoop Vijay on
Hi, I have a query related to baseline modeling for a hotel project in oman. This hotel is built on a hillside with the building recessed into the hill completely on one side.
SS3, No LEED approved pesticides available here
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Ruba Al-Foraih on
I am working on certifying an existing building in a country where non the pesticides approved by LEED are available.
University electric vehicle research facility
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Studio 804 on
We are completing a 3,000 SF project for an on-campus group that takes production vehicles and retrofits them to be completely battery electric.
Adjacent Construction Work
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ralf Lehmann on
Parts of our site are temporary used for construction work for a future adjacent building.
Filtration Media Documentation Table
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Greengrade User on
The table in the form asks for the Location of th AHU, not the location that the temporary filter is installed.
Building and trees shading
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Carolina Vergnano on
Dear all, I'd like to discuss 2 issues: 1- Our project has most of the parking spots outside, at ground level.
Option 3 - Measurement. Height?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Candice Rogers on
Hello - Could you please confirm the measurement height for the daylight readings? Is this the workplane, floor, or other height? Thank you very much - Candice