Forum quick links
Cutsheets for steel products
NC-2009 MRc4:Recycled Contentposted by Raquel Clemente on
In our project it is possible to achieve 30% recycled content only considering the default 25% recycled content value for steel structural products. My question is if we must provide cutsheets for
Fenestration - Baseline vs. Proposed
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have 3 questions to ask:
1.
Documentation for Material Reuse?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Megan White on
What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.
Security Fence Entry the Main Building Entrance?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Mary Kay on
Our project is located at a large airport.
How to conduct Cost-Benefit Analysis
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Hamzeh Saqer on
I just need to know how to conduct the cost-benefit analysis (step 6) for a PV array on-site owned by a third party.
Modeling DOA in Baseline for residential project
NC-v4 EAp2:Minimum energy performanceposted by Saif Abdulameer on
I am working on a small hotel that is served by VRF units and DOA unit which dehumidify and reheat the OA for the guest rooms, when creating the Baseline system (system 2 for this project) should i
Volume to Weight Conversion factors
NC-2009 MRc2:Construction Waste Managementposted by Yohaan Cama on
Hi All,
LEED ID+C CI commercial Interiors v4 water calc credit
CI-v4 WEc1:Indoor water use reductionposted by Robert Fernandez on
A little confused on this aspect of the credit....I was told buy a colleague that this credit can only apply to newly installed fixtures? and not base building restrooms that were not modified?
Option 2 site area
CS-v4 SSc2:Site development - protect or restore habitatposted by Gail Napell on
Hi all
just confirming this is literally based on site area -i.e. our site is very small, so the cost is proportional. Thank you!
Distance between bicycle racks and functional/main entry
Warehouses-NC-v4 LTc6:Bicycle facilitiesposted by Agnieszka Rylska on
This credit requires provision of bicycle racks within 30m of any main/functional entry.