What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove. However, it does not specify what documentation is required? Does anyone have experience documenting this aspect of the credit?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.