Forum quick links
LEED v4 MRc1 LCA credit now officially accepts EN standards as ACP for Europe
NC-v4 MRc1:Building life-cycle impact reductionposted by Panu Pasanen on
A welcome clarification for all LEED projects in Europe! The Alternative Compliancy Path for Europe is now official and allows applying EN 15978 as the LCA framework.
Area definition for roofs
CS-v4 SSc5:Heat island reductionposted by Jens Apel on
I am not quite sure on the definition of roof area and can't find a definition. I would assume that "roof area" consists of all areas that can be seen from above the building.
How to divert 70% of ongoing consumables?
EBOM-v4 MRc4:Solid waste management - ongoingposted by David Baker on
I have a project that is up for recertification next year and wants to pursue the MR credit for diverting ongoing consumables.
Bike Commuting - Lockable Changing Area
Retail-NC-v2009 SSc4:Alternative transportationposted by Lyle Axelarris on
The project has an employee locker room with an attached single ADA bathroom. The bathroom is large enough to change in, and is lockable. However, the door to the locker room is not loc
Preschool Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Heather Holdridge on
I received a preliminary design phase review comment on a preschool project for this PI form. We entered identical values for the peak and average transient occupancy because the building is
Can a hotel+residential tower achieve this credit?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Abena Darden on
I have a hotel + residential tower project with approx 50-50 break up. Can this project achieve Thermal Verification credit?
signage verbage at electric car charging spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Carrie Laurendine on
I feel like im seeing conflicting or vague stuff about the signage for this credit.
Harvesting storm water on a zero-lot-line project and discharging in a nearby canal
CS-v4 SSc4:Rainwater managementposted by Costanza Della Torre on
Dear all,
I am not quite sure the approach we're using in a zero lot line project is correct to achieve this credit and would like to have your opinion.
repositioned non-historic building in a historic DISTRICT
CS-v4 LTc3:High priority siteposted by Gail Napell on
we're renovating a NON-HISTORIC building in a HISTORIC district. new façade, new MEP systems, structural upgrades. Does this meet the intent of Option 1?
let's help Kim Shinn
posted by Anne Hicks Harney on
He just posted the following on the Building Performance Knowledge Community forum: