I have a hotel + residential tower project with approx 50-50 break up. Can this project achieve Thermal Verification credit?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forForum discussion
NC-2009 IEQc7.2: Thermal Comfort—Verification
I have a hotel + residential tower project with approx 50-50 break up. Can this project achieve Thermal Verification credit?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Karin Miller
Senior Sustainability ManagerYR&G
33 thumbs up
May 20, 2015 - 5:42 pm
Unfortunately residential projects are not eligible for this credit and the project cannot pursue a 'partial' credit for the hotel space.
Cynthia Estrada
LEED AP BD&CSDS Architects, Inc.
48 thumbs up
May 21, 2015 - 11:51 am
This is also posted in more detail below(March 2014)
This is a reply I got on a college residence hall project, in which we earned this credit. I found it very interesting and thought it might be helpful-
"Dormitories, however, are not always classified as true residential projects within the LEED rating systems. To be considered residential each dormitory units would need to possess both bedrooms and kitchens. Should the
units/rooms in your project not include kitchens, then your project would be eligible for this point.
Additionally to be eligible for this credit, it is important that the building operate under one overall HVAC system rather than have individually-controlled systems/units for each unit/room." (We had fan coil units for each room)
"There is an additional requirement for the survey of a dormitory, however. Please note - the Survey must be given when the building will be fully occupied - not during breaks/holidays or during non-regular semesters (i.e. summer). "
Kathryn West
LEED AP BD+C, O+M, Green Globes ProfessionalJLL
154 thumbs up
May 21, 2015 - 11:11 am
Thanks for sharing. we've earned this on a couple dormitories but get push back sometimes at LEED meetings from people who say we can't earn it because the project is residential.
GBD Architects
GBD ArchitectsApril 12, 2018 - 5:59 pm
We have a project that is only 3 floors of residential over 18 of hotel. Do you all think we still stand a chance? Probably a CIR situation?