Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Multi-occupant spaces required?

Retail-CI-v4 EQc6:Interior lighting
posted by  Jared Silliker  on 

I find the reference guide confusing on this credit. Am I reading it correctly that multi-occupant spaces do NOT need to be addressed for lighting controls within v4 Retail projects?

0

Kudos to this year's COTE Top Ten Winners!

Green Commons
posted by  Nadav Malin  on 

Huge congratulations to everyone involved with a Top Ten winner this year! 

In a rare feat--Leddy Maytum Stacy got two!

5
Director of Sustainable Design
LMN Architects
LEEDuser Basic Member
4 thumbs up
Fri Apr 20, 2018, 7:24 pm

Humidification system

NC-2009 EAp2:Minimum Energy Performance
posted by  VICTOR MORENO  on 

The energy consumption of humidification system has to be equal in baseline and Proposed building?? 

Is it considered process load??

3
Fri Apr 20, 2018, 7:17 pm

Confirm: Tenant WE calc can include Base Building rainwater system

CI-v4 WEp1:Indoor water use reduction
posted by  Brian Salazar  on 

Hello!  I have a CI project where the tenant occupies multiple contiguous floors.

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Apr 20, 2018, 2:13 am

ASHRAE 50% AEDG

CI-v4 EAc2:Optimize energy performance
posted by  AMY VAN DAM  on 

Can a project pursue the prescriptive compliance path if there is not a ASHRAE 50% Advanced Energy Design Guide that is specifically applicable to the base building (i.e.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 19, 2018, 9:00 pm

Kitchen Faucets

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Angel Vega  on 

The building I am trying to obtain the certification for, is a museum. It has two rooms with faucets for the cleaning staff.

11
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu Apr 19, 2018, 8:55 pm

Pilot Credit Required or not

CI-v4 INc1:Innovation
posted by  Len Sciarra  on 

With the Innovation in Design credit for LEED-CI v4, the reference guide indicates that you can achieve all 5 credits thru a combination of innovation and exemplary performance credits (option 3).&

4
Default Avatar
Founder and CEO
Greenwave Global Consulting (GGC)
LEEDuser Basic Member
8 thumbs up
Thu Apr 19, 2018, 4:43 pm

Number of meters in C&S

CS-v4 EAc3:Advanced energy metering
posted by  Diego Prada  on 

In the credit language for Core & Shell is stated that a sufficient number of meters should be provided to capture total tenant energy use with a minimum of one meter per energy source per floo

1
Thu Apr 19, 2018, 4:47 pm

Friday's Meeting - April 20th

BITuser
posted by  Angela Battisto  on 

Just an FYI that BG's web team is planning on attending your meeting at 1:00 EDT. We will need information on how to join since the info in the invite didn't work last time.

0

AIA Design Awards - Philadelphia Question

Green Commons
posted by  Jonathan Weiss  on 

As part of the Philadelphia AIA COTE, we have been proposing implementing sustainability in some fashion into the design awards with our chapter's design committee.  I know that many of you ha

12
Chief Impact Officer | Design Principal
HMC Architects
LEEDuser Basic Member
0 thumbs up
Thu Apr 19, 2018, 2:24 pm