EPD as an alternative approach to comply with Option-4 requirements
NC-v4 MRc1:Building life-cycle impact reductionposted by Osman on
Hi all,
Is it acceptable to quantify for the impact measures in the proposed building using EPD?
Thank you so much for your support,
Osman
Demolition Waste for entire building vs area designated to be LEED Certified.
CI-v4 MRp2:Construction and demolition waste management planningposted by Timothy Hillhouse on
We are renovating a 84,000 sqft warehouse and only LEED Certifying a portion of it 9865 sqft. Should all the construction waste & recycling only be calculated for the small area being cer
D & C Team perform Commissioning, CxA only Verifies?
NC-2009 EAc3:Enhanced Commissioningposted by Adrian Arenas on
Our project is pursuing Enhanced Cx credit v2009.
Min. Number of Fixtures
NC-v4 WEc2:Indoor water use reductionposted by Cora Kenrick on
Hello Fellow Users,
Is there a minimum number of fixtures that a project is required to get the 6 points for this credit.
materials not used in the original construction are verified in the re-evaluation of the certification?
posted by ANDREZA PASSOS on
I would like to know if Unused Materials, when purchased by the company along with the LEED guidelines, can cause owners to lose certification during the renewal evaluation of the certificate?
Pilot Closing 5/15/2018, New Credit Available
Pilot-Credits EQpc68:Indoor air quality procedureposted by Batya Metalitz on
Pilot Credit 68 will be closing on May 15, 2018.
Credit Review
CS-v4 INc2:LEED Accredited Professionalposted by Luis Fretes on
Can we submit construction credits for review during design?
parking garage
EBOM-2009 IEQc1.4:IAQ Best Management Practices—Reduce Particulates in Air Distributionposted by Alison Rizzo on
Does there have to be a MERV13 filter on makeup air units supplying outdoor air for parkade exhaust?
Landscaped area on a podium
NC-2009 WEc1:Water Efficient Landscapingposted by Lindsay Duthie on
My project consists of some landscaping at grade (2%) and the majority of landscaping on the podium level (18%) for a combined landscaped area that is about 20% of the site.