Forum quick links
And/or Options?
EBOM-v4 SSc1:Site Development- protect or restore habitatposted by Branka Zivkovic on
Hello,
Reference Guide says in Requirements that that it is Option 1 (On-site restoration) OR Option 2 (Financial support).
Construction Waste on a phased project
NC-2009 MRc2:Construction Waste Managementposted by Faith Wilbert on
I was brought on to help finalize templates for a LEED submission. The project was started with Phase 1 - 7 years ago. Phase 1 was Site and Foundations.
HVAC Baseline System 8 - with Purchased Chilled Water only
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
We are working on a project where the selected baseline HVAC system type is 8 with purchased chilled water only from a district cooling plant.
BUG rating exceeding but concealed by building design
CS-v4 SSc6:Light pollution reductionposted by Nuttanee Vongveeranonchai on
Hi all,
advanced metering versus meters
CS-v4 EAc3:Advanced energy meteringposted by Jens Apel on
I am somewhat confused comparing the requirements of C&S and New Construction.
CI Tenant Simulation
CI-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Could anyone confirm that CI v3 projects registered after 04/08/2016 using the Alternative Compliance Path described in LEED Interpretation 10412 (tenant-level energy simulation) must earn at least
Exemplary Performance for CS-v4 LTc4
CS-v4 LTc4:Surrounding density and diverse usesposted by Joanne Sawatzky on
The Quick Reference table in the LEEDv4 Reference Guide BD+C says "yes, except WDC" for Exemplary Performance on this credit; however, when I go to the full credit explanation, Exemplary Performanc
1 point for CS-v4 EAc3 - Advanced energy metering?
CS-v4 EAc3:Advanced energy meteringposted by Joanne Sawatzky on
I assume C&S can achieve 1 point with this credit but the Reference Guide doesn't explicitly say 1 point.
"This credit applies to: