Forum quick links
Solid timber wall shelving / wall panelling made and finished locally
NC-v4 EQc2:Low emitting materialsposted by Aine Doyle on
Dear All,
Non roof measures
NC-v4 SSc5:Heat island reductionposted by Nithya Madan on
Is using mulch considered as a non roof measure under the heat island reduction category?
Coordination / separation with BD&C project
ND-v2009 GIBp1:Certified green buildingposted by Stacey Olson on
I'm working on a project with a very narrow lot line immediately adjacent to the BD&C registered project.
Religious building which contains school, worship space kitchen and events spaces
posted by Pamela Smith on
Can this be under general EBOM or do I need to determine how much area used for each purpose? Thank you.
Recycled Content for differnet plants from the same manufacturer
NC-2009 MRc4:Recycled Contentposted by Elena Enache-Pommer on
Hypothetically, if Plant 1 has 15% pre-consumer recycle, Plant 2 has 25% and Plant 3 has 35%.
Carbon Offsets
NC-v4 EAc7:Green power and carbon offsetsposted by Sebastian Braeuer on
Hello. I am new to the entire LEED topic, therefore I have some general questions. Moreover I would like to hear some recommendations. First of all, Carbon offsets must be Green-e certified.
AgBB standard test for projects inside the U.S.
CI-v4 EQc2:Low emitting materialsposted by Nativa Architecture on
Dear All,
Purchased CHW Baseline System Cooling Source
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
My project is an addition to an existing facility, so the CHW and HHW comes from a district plant. I am modeling the plant as cost neutral, purchased CHW and HHW in baseline and proposed
Southface / BuildingGreen meeting notes - 5/23/18
posted by Angela Battisto on
BITuser Meeting: 5/23/18
Participants: Shane, Andrea, Angela
Notes: