Lighting control for presentation in meeting room

NC-v4 EQc6:Interior lighting
posted by  Elyse Dufrene  on 

LEED requirement says that Lighting for any presentation or projection wall must be separately controlled.

1
Fri Aug 31, 2018, 4:30 pm

Terminal of Airport

Credit Forums
posted by  Konstantina Kalliakoudi  on 

Hello,

I have a project  for the rating system LEED BD+C that is the Terminal of an airport. 

I was wondering if USGBC had any special guidelines for airports.

0

Credit to appeal

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, 
Hope you guy’s will be fine, need your favour and help  to clarify my below queries.

1
Fri Aug 31, 2018, 10:59 am

Venturi-type flow-through vacuum generators or aspirators

Hospitality-NC-v4 WEp2:Indoor water use reduction
posted by  Dionisio Franca  on 

Hi! What are the common uses of "venturi-type flow-through vacuum generators or aspirators"?

0

Announcing: Smart Surfaces Initiative and great research to share

Green Commons
posted by  Mary Ann Lazarus  on 

Hi SDL: sorry to send another missive so soon but I wanted all to be aware of a great new effort just announced today coming from Greg Kats and Vivian Loftness among others - The Smart Surfaces Coa

0

Proof of Satisfaction Post-survey and Corrective Actions?

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Michelle Bracewell-Musson  on 

Assuming we get a 30% response rate, it is my understanding that anything that met the dissatisfied (3 or less on a 7-point scale) criteria, must be corrected.  How do we measure this?&nb

1
Thu Aug 30, 2018, 9:59 pm

The EPA Pushes Back on Asbestos Criticism

Green Commons
posted by  Michael Davis  on 

Greetings, Green Gurus:

48
Director of Sustainability
isgenuity
LEEDuser Basic Member
0 thumbs up
Thu Aug 30, 2018, 8:51 pm

Review Comment: Leakage Rate Calculations

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Levi Jimenez  on 

More of a solution than a question I suppose;  I was recently provided the following review comment:

-----

0

excel spreadsheet locked problems

NC-v4 EQc2:Low emitting materials
posted by  alix fox  on 

The Products tab only has enough space for 9 items, and the "add a line" button doesn't work. I copied and pasted the blank lines with formatting in order to add all the items I need.

0

Drinking water test necessary if plumbing removed

Pilot-Credits EQpc105:Lead Risk Reduction
posted by  Zara Fahim  on 

The project site is on a historic district which had significant ground water and soil contamination. The project building is also an existing building that is being renovated for the project.

1