Forum quick links
Lighting control for presentation in meeting room
NC-v4 EQc6:Interior lightingposted by Elyse Dufrene on
LEED requirement says that Lighting for any presentation or projection wall must be separately controlled.
Terminal of Airport
posted by Konstantina Kalliakoudi on
Hello,
I have a project for the rating system LEED BD+C that is the Terminal of an airport.
I was wondering if USGBC had any special guidelines for airports.
Credit to appeal
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi,
Hope you guy’s will be fine, need your favour and help to clarify my below queries.
Venturi-type flow-through vacuum generators or aspirators
Hospitality-NC-v4 WEp2:Indoor water use reductionposted by Dionisio Franca on
Hi! What are the common uses of "venturi-type flow-through vacuum generators or aspirators"?
Announcing: Smart Surfaces Initiative and great research to share
posted by Mary Ann Lazarus on
Hi SDL: sorry to send another missive so soon but I wanted all to be aware of a great new effort just announced today coming from Greg Kats and Vivian Loftness among others - The Smart Surfaces Coa
Proof of Satisfaction Post-survey and Corrective Actions?
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Michelle Bracewell-Musson on
Assuming we get a 30% response rate, it is my understanding that anything that met the dissatisfied (3 or less on a 7-point scale) criteria, must be corrected. How do we measure this?&nb
The EPA Pushes Back on Asbestos Criticism
posted by Michael Davis on
Greetings, Green Gurus:
Review Comment: Leakage Rate Calculations
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Levi Jimenez on
More of a solution than a question I suppose; I was recently provided the following review comment:
-----
excel spreadsheet locked problems
NC-v4 EQc2:Low emitting materialsposted by alix fox on
The Products tab only has enough space for 9 items, and the "add a line" button doesn't work. I copied and pasted the blank lines with formatting in order to add all the items I need.
Drinking water test necessary if plumbing removed
Pilot-Credits EQpc105:Lead Risk Reductionposted by Zara Fahim on
The project site is on a historic district which had significant ground water and soil contamination. The project building is also an existing building that is being renovated for the project.