Topic | Recent |
---|---|
Re: Controllability Through a Web-based Interface and the BMSNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by James Del Monaco on Aug 25, 2010, 10:54 am
I understand the typical methods for achieving this credit, i.e., underfloor air, etc. And I have documented this on other project (under NC v2.2). But I have a project where the approach may... Last reply: Lauren Sparandara, Aug 25, 2010, 1:15 pm |
|
Stormwater cisternNC-2009 SSc6.2: Stormwater design - quality controlposted by Jana Schulz on Jul 21, 2010, 1:14 pm
This is a project located in previously developed urban area. We have a cistern capable of receiving 100% of the site's runoff, however, only a small amount of this water will be reused in... Last reply: Amy Rider, Aug 25, 2010, 1:52 pm |
|
Strategies to filter TSSNC-2009 SSc6.2: Stormwater design - quality controlposted by Habitech Distretto Tecnologico Trentino on Jul 30, 2010, 3:48 am
The project is located in Italy and the project team is able to treat the 90 % of the average annual rainfall using some systems in series. The water comes from the roofs and all the hardscape in... Last reply: Amy Rider, Aug 25, 2010, 1:59 pm |
|
Space Usage TypesEBOM-2009 SSc1: LEED Certified Design and Constructionposted by Steve Offutt on Aug 11, 2010, 4:01 pm
I also wasn't sure where to ask this question. It might be worthwhile to have a general... Last reply: Jenny Carney, Aug 25, 2010, 6:19 pm |
|
definition of "bus line" vs. "bus stop"CI-2009 SSc3.1: Alternative transportation - public transportation accessposted by Philip Herriges on Aug 23, 2010, 5:45 pm
I'm not sure that the graphic above for this credit for option #2 is correct. The credit reads for option 2: "Locate the project within 1/4 mile... Last reply: Simon Sue, Aug 25, 2010, 9:14 pm |
|
Wood fencing around the exterior of the buildingNC-2009 MRc7: Certified Woodposted by Lester Cox on Aug 23, 2010, 6:39 pm
Public Branch Library in Dallas, Texas - We want to utilize... Last reply: Doug Pierce, AIA, Aug 26, 2010, 10:17 am |
|
Re: owner adds work outside of LEED Site AreaGeneral forumsposted by David Posada on Aug 26, 2010, 12:18 pm
It probably depends on the timing and the nature of the additional work. For changes made *inside* the LEED Boundary after the Design Phase review, but before the Construction Phase... |
|
Vacant SpaceEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Alice Cook on Jul 29, 2010, 1:24 pm
Portfolio Manager guidance currently indicates that if vacant space is less than 10%, then it should be grouped with occupied space. However, I read the USGBC Information Guidance version 1... Last reply: Jenny Carney, Aug 26, 2010, 4:15 pm |
|
On-Site Renewables- Submeters installed and Performance PeriodEBOM-2009 EAc4: On-Site and Off-Site Renewable Energyposted by John Ida on Aug 18, 2010, 8:44 pm
For our project, the office building has had a Solar Thermal Array that runs one of their packaged ACUs last year We are now installing the BTU submeters to measure the actual energy generated... Last reply: Jenny Carney, Aug 26, 2010, 4:18 pm |
|
BOP & ASHRAEEBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Pablo Fortunato Suarez on Aug 26, 2010, 11:30 am
The LEED Guidebook cites the ASHRAE 2007 Handbook as reference material and the sample... Last reply: Jenny Carney, Aug 26, 2010, 4:22 pm |