Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
1
Mon Mar 11, 2019, 10:03 pm

Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?

NC-v4 EQc2:Low emitting materials
posted by  Annie Levan  on 

Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?

2
Sustainability Consultant
Stantec
LEEDuser Premium Member
13 thumbs up
Fri Oct 5, 2018, 6:52 pm

Acoustic Consultant

NC-v4 EQc9:Acoustic performance
posted by  Cora Kenrick  on 

I just want to clarify that it is not a requirement to have an acoustic consultant for this credit?

 

Thanks for the help.

1
Thu Oct 11, 2018, 8:28 pm

Sam Cx agent for Enhanced & Envelope commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Cora Kenrick  on 

Can the same Cx complete both option 1 and option 2 for the Enhanced Commissioning?

2
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Fri Oct 5, 2018, 5:55 pm

expiration of floorscore certification or CRI GLP during construction

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Debra a. Lombard  on 

expiration of floorscore certification or CRI GLP during construction:

at time of submittal review/approval floor product had current certification.

0

Test Method WPSTM C1454 for sealant

NC-v4 EQc2:Low emitting materials
posted by  Marina Dimitriadis  on 

We have a project that wants to use GE SCS1000 Silicone, but the test method for this product is WPSTM C1454 (V: 20 g/L). Would this product still meet the General Emissions and VOC limits?

1
Fri Oct 12, 2018, 7:26 pm

Lighting controls requirements

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Marina Curto  on 

Hi everyone, 

I'm working on a School project in v2009 and I have some doubts whether the lighting controls design would meet credit requirements. I have two different cases:

0

Shower Use in Schools

Schools-NC-v4 WEp2:Indoor water use reduction
posted by  Nathan Gauthier  on 

The default fixture use for showers in schools is 0 per student. Have others kept this value or changed it when including a gym with shower room?

2
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Thu Oct 4, 2018, 5:45 pm