VOC budget process in this credit

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Albert Sagrera  on 

Can I use the same "VOC budget process" to justify this credit as in credit 4.2 if I make a misatke or If I have just one product that is used minimally on a project?. Thanks

5
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Thu Nov 8, 2018, 11:28 pm

Certification required to perform pressure differential test?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Vanessa Nelson  on 

Is a certification required to perform the pressure differential test? I'm wondering if it needs to be done by a specialty testing company or can it be done by the Mechanical Sub?

1
Thu Nov 8, 2018, 11:30 pm

Documents - which Language?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ernst Schriefl  on 

Hi,

 

This is maybe an obvious question but our projects are located in Austria. Therefore most of our documents are in German.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Thu Nov 8, 2018, 7:58 pm

Single Phase UPS

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Omar Delgado  on 

Greetings all, I have a CI project that has single phase UPS, PoE Switches, and some AiroNet AP. Are all these excluded from the calculation? Thanks!

3
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Thu Nov 8, 2018, 7:58 pm

calculating rated power and bigger questions

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Michele Helou  on 

I cannot get the nameplate power from an Energy Star residential refrigerator used for a commercial project. I called the manufacturer, checked the manuals, etc. no luck.

5
Thu Nov 8, 2018, 7:57 pm

More on UPS s

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Susan Di Giulio  on 

Hi, I understand all the previous discussion UPSs but our situation is just a tad different, The project in question is intensely tech related, and the UPS needed as backup is a 3 phase, 50,000 kV

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:56 pm

No-break (UPS - UPS - Uninterruptible Power Supplies)

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Vitorio Lepiane  on 

I am trying to determine if we need to include " No-break (UPS - Uninterruptible Power Supplies) " in our Energy Star documentation for this credit.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:55 pm

UPS - Excluded or Included in Energy Star calculation

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Graeme Smith  on 

I have two questions regarding the inclusion of UPS in the 'Energy Star' calculation for EAc1.4 in LEED v2009. Q1.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:55 pm

ENERGY STAR UPS - 160KW and 480V

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Carla Lopez  on 

Hi, It is of my best understanding that the UPSs are included as "eligible equipment" for both EAp2 and EAc1.4 as stated on the LEED for Commercial Interiors v2009 Reference Guide since they fall

7
Senior Sustainability Manager
JLL
LEEDuser Basic Member
10 thumbs up
Thu Nov 8, 2018, 7:55 pm

Cleanroom Chase Area Classification

NC-v4 EAp2:Minimum energy performance
posted by  Michael Hill  on 

I am wondering if anyone knows if a cleanroom return chase would be counted in the conditioned floor area for determining the primary system type for ASHRAE 90.1.

1
Thu Nov 8, 2018, 8:03 pm