VOC budget process in this credit
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Albert Sagrera on
Can I use the same "VOC budget process" to justify this credit as in credit 4.2 if I make a misatke or If I have just one product that is used minimally on a project?. Thanks
Certification required to perform pressure differential test?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Vanessa Nelson on
Is a certification required to perform the pressure differential test? I'm wondering if it needs to be done by a specialty testing company or can it be done by the Mechanical Sub?
Documents - which Language?
posted by Ernst Schriefl on
Hi,
This is maybe an obvious question but our projects are located in Austria. Therefore most of our documents are in German.
Single Phase UPS
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Omar Delgado on
Greetings all, I have a CI project that has single phase UPS, PoE Switches, and some AiroNet AP. Are all these excluded from the calculation? Thanks!
calculating rated power and bigger questions
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Michele Helou on
I cannot get the nameplate power from an Energy Star residential refrigerator used for a commercial project. I called the manufacturer, checked the manuals, etc. no luck.
More on UPS s
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Di Giulio on
Hi, I understand all the previous discussion UPSs but our situation is just a tad different, The project in question is intensely tech related, and the UPS needed as backup is a 3 phase, 50,000 kV
No-break (UPS - UPS - Uninterruptible Power Supplies)
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Vitorio Lepiane on
I am trying to determine if we need to include " No-break (UPS - Uninterruptible Power Supplies) " in our Energy Star documentation for this credit.
UPS - Excluded or Included in Energy Star calculation
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Graeme Smith on
I have two questions regarding the inclusion of UPS in the 'Energy Star' calculation for EAc1.4 in LEED v2009. Q1.
ENERGY STAR UPS - 160KW and 480V
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Carla Lopez on
Hi, It is of my best understanding that the UPSs are included as "eligible equipment" for both EAp2 and EAc1.4 as stated on the LEED for Commercial Interiors v2009 Reference Guide since they fall
Cleanroom Chase Area Classification
NC-v4 EAp2:Minimum energy performanceposted by Michael Hill on
I am wondering if anyone knows if a cleanroom return chase would be counted in the conditioned floor area for determining the primary system type for ASHRAE 90.1.