Forum quick links
Thermal comfort control requirement
NC-v4 EQc5:Thermal comfortposted by YunJeong Choe on
Is there no area limit to install thermal comfort control, such as the only one thermal comfort control should be installed on common use space per 200m2?
Daylight Sensor and/or Occupancy Sensor
NC-v4 EAp1:Fundamental commissioning and verificationposted by Purva Saxena on
Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq.
Wastewater used in cooling tower dilution tank.
ND-v4 GIBc14:Wastewater managementposted by Varunya Jarunyaroj on
In the case that, at least 25% and up to 100% of annual wastewater (recycled water) are used in cooling tower dilution tank for dilution purpose before being discharged to public sewer sy
Office building - Water cooled VRF DES
NC-v4 EAp2:Minimum energy performanceposted by Aravindraj RB on
Hello,
IEQ - Interior lighting control (Scene switch)
NC-v4 EQc6:Interior lightingposted by Aravindraj RB on
Hello,
Winter Summit 2019: Design Process
posted by Nadav Malin on
Attached are the raw notes from the Design Process Conversations.
And here are the Guiding Questions from the Agenda Survey:
Winter Summit 2019: Equity, Diversity & Inclusion
posted by Nadav Malin on
Is this EDI, or JEDI? (Justice, Equity...)
Notes (attached) and Guiding Questions:
-
Equity, Diversity, And Inclusion In Our Firms
Winter Summit 2019: Better Product Choices
posted by Nadav Malin on
We talked about products in Eastern region and Western region groups.
Guiding questions:
-
Better Product Choices On Every Project: How To Get There?
Winter Summit 2019: 2030 Commitment Check-in
posted by Nadav Malin on
Notes and Guiding questions here--please add your own!
-
2030 Commitment Check-In: Is it leading to more awareness and better outcomes on projects?
Winter Summit 2019: SDL Best Practices
posted by Nadav Malin on
Another Break-out by Firm Size.
Guiding Questions:
-
SDL Best Practices by Firm Size