Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq. ft.) are already provided with occupancy sensors ?
Thanks
Forum discussion
NC-v4 EAp1: Fundamental commissioning and verification
Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq. ft.) are already provided with occupancy sensors ?
Thanks
LEEDuser is supported by our premium members, not by advertisers.
Go premium forFor a building with individual systems per unit, does every single system need to be commissioned?
What kinds of projects must the CxA demonstrate experience on?
What level of authority does the CxA have towards correcting inaccurate or erroneous construction?
Can the CxA be a member of the design or construction team?
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.