SS 6.1 Case 2 options?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Karen Joslin on
Has anyone been successful applying the impounding/receiving stream protection approach for a previously >50% impervious site?
RE100
posted by Conor McGuire on
Are you or companies considering joining RE100? http://there100.org/going-100
Diverse Uses within Existing Building on Addition Project
NC-v4 LTc4:Surrounding density and diverse usesposted by Eric White on
Our project is a 5 storey addition to the east side of an existing campus centre.
Four (4) Surrounding LEED Silver Buildings
NC-v4 LTc1:LEED for Neighborhood Development locationposted by Daniel Davis on
I am with a General Contractor, and we have completed four (4) BD+C New Construction LEED Silver buildings for a college in Kentucky between the years 2009-2013 (I think all under v3). We are
Surrounding density
NC-v4 LTc4:Surrounding density and diverse usesposted by chaima michou on
for option 1 is the density found to be equal to or greater than the values in the table!!
anhydrite board with cellulose fibers
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Agnieszka Rylska on
Hello,
G3.1.1 | Exception b (40 equivalent full-load hours per week)
CS-2009 EAp2:Minimum Energy Performanceposted by Danilo Ilic on
From what I could see in related posts, "40 equivalent full-load hours per week" are plainly interpreted as 40 working hours and without any connection to thermal load and I am not
SD Leaders 2019 Salary Survey
posted by RoseAnn Grimes on
It’s here! By popular demand we’re re-running the SDL Salary Survey that we last ran in 2015.
Residential project water fixtures and appliances water use
CS-v4 WEc2:Indoor water use reductionposted by Andrzej Gutowski on
Dear collegues,