Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
1
Sat Aug 3, 2019, 12:40 pm
1
Tue Sep 3, 2019, 7:00 pm

Living Building Leaders Aug 2 Agenda--supporting the roll-out of LBC 4.0 and Core

SD Leaders
posted by  Nadav Malin  on 

For those at Islandwood for the Summer Summit this week, we have this post-Summit meeting opportunity with James Connelly and Kathleen Smith from ILFI.

1
Fri Aug 2, 2019, 1:46 pm

Not yet procured equipment

CS-2009 EAp3:Fundamental Refrigerant Management
posted by  Summer   on 

I'm thinking if we could submit the form with the complete list of equipment for design review if there's no model (brand) and model number though the project team is sure that it is all new equipm

2
Default Avatar
LEEDuser Basic Member
2 thumbs up
Thu Aug 1, 2019, 7:10 am

Water fountains and impact on OUtdor Water Use reduction in LEED v.4

NC-v4 WEc1:Outdoor water use reduction
posted by  Tim Bell  on 

Does anyone have any previous experience on the impact of water fountains and features on Outdoor Water Use reduction?  Should these be included or not?  There does not appear to be any s

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Aug 1, 2019, 4:39 am

Daylight Option 2 Grid Size

NC-v4 EQc7:Daylight
posted by  Ziad Zeytoun  on 

The LEED Reference Guide does not specify a grid size for daylight illuminance simulations.

1
Mon Apr 8, 2024, 2:18 am

5 Year contracts delivered annually

NC-v4 EAc7:Green power and carbon offsets
posted by  Heather Schrock  on 

Hi! I am a REC retailer and I strongly encourage LEED to consider changing the requirement that RECs be delivered annually under a 5 year contract.

0