Forum quick links
Modeling Proposed and Baseline buildings
CI-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Living Building Leaders Aug 2 Agenda--supporting the roll-out of LBC 4.0 and Core
posted by Nadav Malin on
For those at Islandwood for the Summer Summit this week, we have this post-Summit meeting opportunity with James Connelly and Kathleen Smith from ILFI.
Eligibility of facilities outside the LEED Project Boundary
CI-v4 LTc4:Bicycle facilitiesposted by Ricardo Sá on
Dear All,
Not yet procured equipment
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Summer on
I'm thinking if we could submit the form with the complete list of equipment for design review if there's no model (brand) and model number though the project team is sure that it is all new equipm
Water fountains and impact on OUtdor Water Use reduction in LEED v.4
NC-v4 WEc1:Outdoor water use reductionposted by Tim Bell on
Does anyone have any previous experience on the impact of water fountains and features on Outdoor Water Use reduction? Should these be included or not? There does not appear to be any s
Daylight Option 2 Grid Size
NC-v4 EQc7:Daylightposted by Ziad Zeytoun on
The LEED Reference Guide does not specify a grid size for daylight illuminance simulations.
5 Year contracts delivered annually
NC-v4 EAc7:Green power and carbon offsetsposted by Heather Schrock on
Hi! I am a REC retailer and I strongly encourage LEED to consider changing the requirement that RECs be delivered annually under a 5 year contract.
batteries chargers - load shift needs to be mentioned in O&M plan, but where?
EBOM-v4 EAp1:Energy efficient best management practicesposted by Jimmy Adames on
Hi everyone,