Forum quick links
Monitoring-based Cx for CS projects
CS-v4 EAc1:Enhanced commissioningposted by Shannon Oletic on
What are the required measurement points for a core and shell project?
How do credits get removed? Central vacuums mystery
posted by Nathan Barlow on
Central vacuums existed in the "Contaminant Control" category in LEED Homes 2008: https://www.usgbc.org/node/1731967?return=/credits/homes/v2008/indoor-environmental-quality
certification of an airprt's Terminal
posted by Evangelia Mertziou on
Is it achievable the LT Credit "Surrounding Density and Diverse Uses", Option2 for the certification of an airport's Terminal?
USGBC approved equivalent for ASHRAE standards
CI-v4 EAp1:Fundamental commissioning and verificationposted by Alexander Spilger on
Hi,
Enhanced Commissioning
NC-v4 EAp1:Fundamental commissioning and verificationposted by saif eddine majdaoui on
We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades),
EAp1-Fundamental Commissioning and Verification - OPR / BOD
NC-v4 EAp1:Fundamental commissioning and verificationposted by Maria Peralta on
Hello, I have a question regarding the OPR and BOD documents.
LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements
CI-v4 EAc2:Optimize energy performanceposted by Kristen Callori on
Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.