Log in
Forum » CS-2009 WEp1
Topic

BLOW-OUT FIXTURE FOR CS v2.0

CS-2009 WEp1: Water Use Reduction
posted by Carolina Vergnano on Apr 20, 2011, 9:31 am

First of all, I’m sorry for posting a question of the v2.0 Guide in the 2009 page, but there is no space for CS v2.0 projects anymore.

I am working on a Core&Shell v2.0 project where...

Last reply: Karen Blust, Apr 27, 2011, 1:32 am

WE Prerequisite qualification for a minimal CS project

CS-2009 WEp1: Water Use Reduction
posted by Tak Louie on Mar 14, 2011, 6:48 pm

Our client is building a Retail center for a large grocer with small satellite retail spaces. The balance of the building is simply a parking garage with an enclosed and tempered elevator lobby....

Last reply: Susann Geithner, Apr 25, 2011, 9:30 am

Transient fixture uses

CS-2009 WEp1: Water Use Reduction
posted by Carolina Vergnano on Apr 8, 2011, 3:17 pm

Hi There,

I've got two projects, one is a shopping mall and the other a health clinic, but I can't figure out the uses for the respective transients. I've addopted for the shopping...

Last reply: Tristan Roberts, Apr 22, 2011, 6:45 pm

Aquifer use

CS-2009 WEp1: Water Use Reduction
posted by Gabriela Hernández Castillo on Apr 11, 2011, 12:52 pm

Our project has underground water with potable quality. Will the use of this water be considered an option for reducing the potable water consumption that is supplied by municipal sources?

Last reply: Susann Geithner, Apr 13, 2011, 10:24 am

documentation of adjustable flowrates

CS-2009 WEp1: Water Use Reduction
posted by Florian Schmidtchen on Nov 25, 2010, 3:23 am

Has anyone experience with the documentation of adjustable flowrates?
Some fixtures like faucets and showerheads can be adjusted to a lower flowrate, however the spec sheet only shows a...

Last reply: Karen Blust, Mar 21, 2011, 2:03 am

WEp1- Handheld bidet faucets

CS-2009 WEp1: Water Use Reduction
posted by Tapio Peltonen on Mar 10, 2011, 7:26 am

Every toilet stall in the project includes a handheld bidet faucet (or spray) and a lavatory. Are these calculated as lavatory faucets or ignored in the water use calculation?

Last reply: Tapio Peltonen, Mar 11, 2011, 12:34 pm

Driver's Toilets in a Core & Shell Building

CS-2009 WEp1: Water Use Reduction
posted by Maya Karkour on Feb 14, 2011, 9:08 am

Hi,

We are working on a luxurious Core & Shell Residential Building. The future tenants will decide on the water fixtures for their own flats/apartments. However, there will also be...

Last reply: Maya Karkour, Feb 15, 2011, 3:18 am

WEp1- LEED Online sample form

CS-2009 WEp1: Water Use Reduction
posted by Tapio Peltonen on Jan 28, 2011, 2:35 am

The LEED Online sample form for water use reduction shows 21% reduction of water use in all fixtures. However, at the end of the form it indicates "N".
What is the reason for that?

Last reply: Tapio Peltonen, Feb 1, 2011, 12:29 pm

WEp1- Local Code

CS-2009 WEp1: Water Use Reduction
posted by Tapio Peltonen on Dec 7, 2010, 11:26 am

How to earn Water Use Reduction Points, when the local code requires e.g. minimum flow for Commercial lavatory faucets=1.6 gpm and over the baseline for other fixtures, too.

Last reply: Tapio Peltonen, Dec 8, 2010, 10:50 am

Design Case vs Baseline Case

CS-2009 WEp1: Water Use Reduction
posted by Biagio Arevalo on Nov 26, 2010, 5:55 pm

I´m working on the template and I want to know if in the baseline case I input the conventional public lavatory faucet of 0.5 gpm can I input for the desing case 0.25 gpc of the metering faucets...

Last reply: Tristan Roberts, Dec 7, 2010, 10:28 pm