recyclable storage area outside the boundary
NC-v4 MRp1:Storage and collection of recyclablesposted by Larissa Murakami on
Would it be possible to use an area outside the boundary for the recyclable storage area?
Using EMS to calculate some End-Use Energy
NC-v4 EAc3:Advanced energy meteringposted by Melissa Crowe on
Hi All
We have metering set up for most of the end-uses that represent over 10% of total energy but for some equipment is it not cost effective or practical.
LTc5 Quality Transit - is and exemplary performance path avaiable?
CS-v4.1 LTc5:Access to Quality Transitposted by Susan Di Giulio on
We have a LEED-CS project adjacent to a major regional transit hub and it is actually possible that we could double the 360 wkday trips/216 wkend trips required for 6 points.
Option 2 - Is there still a minimum sample area requirement?
NC-v4 EQc4:Indoor air quality assessmentposted by Daniel Smith on
I am quoting to provide Option 2 IAQ testing for my first V4 BD+C project.
Manufacturing Plant Energy Consumption
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are working on a project that is pursuing LEED v4: New Construction.
Walkable Project Site
NC-v4 INc1:Innovationposted by Rebecca Aarons-Sydnor on
We are looking at this for a building that is on a plaza and next to green space (athletic field) and a body of water (lake). There is only pedestrian and bike access to the building via the
Effects of Construction/Renovation on Employee Productivity
posted by Heather Holdridge on
Does anyone have any research studies they could share on the effect of construction/renovation noise and activity on employee productivity? I'm trying to make a case for the measurable negat
Reasonable LEED Boundaries
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Marlen Aleman on
Hi, the scope of the project is to renovate the 3rd floor of a 5 storey building (all floors will be renovated eventually but the client wants to certify each floor as we go).