Forum quick links
Bicycle Network Connections
NC-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
This must be obvious to everyone but me since I don't see a question on this. Our project is adjacent to a well established bike trail that extends for 10 miles or more in both directions.
Exterior Lighting Requirements
Pilot-Credits SSpc55:Bird collision deterrenceposted by Rick Tucker on
With the advances in exterior LED lighting drivers and controls, would it make sense to look at dimming exterior lights down to say 10% in lieu of turning them off completely from midnight to 6am a
Using ASHRAE 90.1-2013 as reference standard for v4 projects
NC-v4 EAp2:Minimum energy performanceposted by Gail Vittori on
Has there been an equivalency established for LEED v4 projects that use ASHRAE 90.1-2013-Appendix G as reference standard (as there was for LEED 2009 projects that used ASHRAE 90.1-2010-Appendix G
Chilled Water rinsing / cleaning - How to ensure safe disposal ?
NC-v4 SSp1:Construction activity pollution preventionposted by Amine Zeidane on
Hello LEED Community,
LEED Boundary - Police Training Facility
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Josie Plaut on
Hi,
Extrapolate daylight results for similar floors
NC-v4 EQc7:Daylightposted by Agnieszka Kaczmarek on
Illuminance simulations should be perform for all the regularly occupied spaces. What if I have 20-storeys building with same geometry and same layout?
thermal control for the energy saving
Pilot-Credits EQpc114:Learning controls for thermal comfortposted by Jinyong Song on
Thermal comfort and energy saving seem to be closely related.
For a store project, energy saving is required more than thermal comfort of space.
Case 2. Demand response program not available (1 point)
CS-v4 EAc4:Demand responseposted by Ciaran McCabe on
Has anyone successfully used a Building Management System to achieve this credit where a program is not available. If you are you able to provide details of the system used. Thanks.
NC-v4.1 LTc8: Electric Vehicles
NC-v4.1 LTc8:Electric Vehiclesposted by Brian Johnson on
Hello, I have a question regarding the LTc8 Electric Vehicles credit. If our project only requires 2 parking spaces to have ESVE installed, does that mean each parking space must have an inde
Weather-Based Controls/ Moisture & Rain Sensors
NC-v4 WEp1:Outdoor water use reductionposted by LUCY WILLIAMS on
Hi All-