Hello, I have a question regarding the LTc8 Electric Vehicles credit. If our project only requires 2 parking spaces to have ESVE installed, does that mean each parking space must have an independent charging station? Or can 1 station be installed with the capacity to handle both parking spaces?
Thanks,
Brian
Bipin Karki
Sustainability Project Manager87 thumbs up
January 15, 2020 - 8:13 am
Hello Brian,
This should be fine considering both the parking spaces are adjacent to each other. You can include brief description explaining your case. Make sure proper signage has been provided for EVSE parking spaces and charging station meets the requirement. Manufacturer's documentation should demonstrate that the charging equipment has a charging capacity of at least Level 2 (208-240 volts), meets the relevant regional or local standard for electrical connectors, and is networked or internet addressable.
Hope this helps!