Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

62 2010 MZ Calc excel for LEED v 4.

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Sadaf Alam  on 

Hi ,

 

Does anyone have 62 2010 MZ Calc excel for LEED v 4. 

1
Sat Jun 6, 2020, 12:20 am

Acoustic Performance

NC-v4.1 EQc9:Acoustic Performance
posted by  Kyle Roth  on 

Is this credit to require all of the structure (walls, floor, floor slab, roof ect.) to be accounted for in measuring for this credit? Or just the walls?

0

SCL Carbon Group -- Notes from 2/26/20 Mtg; Links for Doodle Poll for Next Mtg; Link to Shared Google Drive

SC Leaders
posted by  Dave Walsh  on 

Hi All,

Attached are the meeting notes from the Carbon Group's 2/26/20 -- also in the PDF are the slides presented in the 2/26 meeting.

7
Principal
The Beck Group
LEEDuser Basic Member
98 thumbs up
Wed Mar 11, 2020, 4:10 pm

Track light power consumption

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Mahesh Shankar  on 

This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting.

1
Wed Mar 11, 2020, 12:55 pm

Summit Follow-up

SC Leaders
posted by  Norma Lehman  on 

Hello!

6
Director of Sustainable Services
Miron Construction Co., Inc.
LEEDuser Premium Member
40 thumbs up
Tue Mar 10, 2020, 10:46 pm
7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Mar 10, 2020, 9:13 pm

SCL Water Sub-Group

SC Leaders
posted by  Patty Lloyd  on 

The Water Sub-Group met today. This group is working on three items: 

1. Project Water Plan Template

2. Project Water Tracking Form Template

0

Energy modeling, Chiller at AHRI conditions

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Sánchez Sánchez  on 

Hi,

I’m modeling a building which has water-cooled chillers.

1
Wed Mar 25, 2020, 7:15 pm

Submitting evidence in design or post-construction stage

NC-v4 EQc9:Acoustic performance
posted by  Greenlab   on 

Hi,

We are in the process of replying to a LEED Certification Review – split review, design stage – of a building which is now close to completion.

1
Fri Jul 17, 2020, 4:12 pm