Water Metering for LEED Group: Single Meter for 3 Buildings?NC-v4 WEp3: Building-level water meteringposted by Mike Refsland on May 22, 2024, 5:36 pm
I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group. The design team would like to provide 1 potable water meter that serves all 3... |
|
Question about Innovation: Purchasing- lamps for LEED v4 ID+CCI-v4 INc1: Innovationposted by Courtney Royal on Apr 10, 2020, 11:15 am
I am confused, if you wanted to use this credit as an Innovation credit in a v4 ID+C project, does the entire... Last reply: Catarina Costa Goncalves, May 22, 2024, 11:54 am |
|
Purchasing- Lamps: EXIT signsNC-v4 INc1: Innovationposted by Edgar Arevalo on Feb 5, 2024, 3:14 pm
I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator. Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and... Last reply: Catarina Costa Goncalves, May 22, 2024, 11:52 am |
|
LEED BD+C: New ConstructionLEED v5 BD+C/ID+C: Overall and Appendix Public Commentsposted by Andrea Wald on May 22, 2024, 12:34 am
LEED certification needs to address the topic of artificial turf. Specifically, a prerequisite for LEED certification should be that the design includes no artificial turf. Credits and points... |
|
LEED v5 O&M Existing Buildings public commentsLEED v5 O&M Existing Buildings Public Commentsposted by Nadav Malin on Apr 2, 2024, 1:57 pmShare your comments on the first public comment draft of LEED v5 O+M Existing Buildings on this forum. You can either reply to this thread or use the "Post a Question/Comment" button to start a... Last reply: Lyle Axelarris, May 22, 2024, 9:41 am |
|
No-Cooling Tower for full credit? Option 2- Optimize Water Use for Cooling- 100% ReductionCS-v4.1 WEc3: Optimize Process Water Useposted by Grace Friedhoff on Feb 24, 2022, 3:08 pm
I am working on a C&S project that has a baseline system designated for the building using ASHRAE 90.1-2016 Appendix G Table G3.1.1 that includes a cooling tower (system 7) AND there is no... Last reply: Kathy Collins, LEED AP , WELL AP, May 22, 2024, 9:12 am |
|
LEEDv5 O+M Public Comment: Building Enclosure retrofit designLEED v5 O&M Existing Buildings Public Commentsposted by Lyle Axelarris on May 22, 2024, 9:03 am
I’m very disappointed to STILL see no LEED credit address moisture management in building envelope design. As our industry is adding continuous insulation (for good reasons), there are more and... |
|
Case 2 Demand Response Capable Building with a "future" programNC-v4.1 EAc4: Grid Harmonizationposted by Chris Flint Chatto on May 27, 2021, 8:11 pm
Is case 2 only available to projects with utilities that don't have... Last reply: AJ Ahmed, May 22, 2024, 7:21 am |
|
LEED v5 O&M Existing BuildingsLEED v5 O&M Existing Buildings Public Commentsposted by Richard Curry on May 20, 2024, 1:33 pm
My name is Richard Curry, and my comments represent the views of ST Facility Maintenance Consulting, LLC, a facility service consultant to owners and operators of commercial cleaning companies. ... Last reply: Krista Maylin, May 22, 2024, 4:49 am |
|
Sound Isolation ACP?NC-v4 EQc9: Acoustic performanceposted by Brightworks Sustainability on Apr 25, 2017, 7:42 pm
HI all, is anyone familiar with an alternate option for complying with the sound isolation requirements? My project is so close to meeting this but it isn't feasible to provide additional layers... Last reply: Anna Okviana, May 22, 2024, 2:56 am |