Forum quick links
Baseline HVAC system for existing building
NC-v4 EAp2:Minimum energy performanceposted by Ying Lindsey on
Dear All,
LTc7 Reduced Parking Footprint - Campus approach
posted by Ricardo Sá on
Dear All,
We are currently working in a project of a new University Campus of Universidade Católica de Portugal, that will include two different buildings:
Building: pharmaceutical industry under LEED BD+C New Construction?
posted by Stephan Zweig on
Hello to all,
I wnated to ask if a pharmaceutical industry can be certified under LEED BD+C New Construction?
Cost-effective R-40 wall assembly / thermal analysis
posted by Stephen Endy on
Can anyone point me to a (dream?) resource listing effective R-values of various wall assemblies? We are trying to find a cost-effective R-40 wall assembly for a one and two story public 
SAVE THE DATE - All Peer Network 2020 Summit Season Closing
posted by RoseAnn Grimes on
Hello Everyone!
LEED Boundary with Main Building, Parking Garage & Parksmart
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ralph Bicknese on
We have a new 609,000 sf building seeking LEED BD+C v4 certification. A new 1800 space parking garage will be built design-build as part of the project but by separate designer, same CM.
Required documentation - credit form versus reference guide
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Dee Spiro on
I'm posing this question under this particular credit, but it's actually applicable to a number of credits in a number of the rating systems. For this credit, the credit form includes th
Required documentation - credit form versus reference guide
Retail-CI-v4 MRc2:Interiors life-cycle impact reductionposted by Dee Spiro on
I'm posing this question under this particular credit, but it's actually applicable to a number of credits in a number of the rating systems. For this credit, the credit form includes th
Many measurement points
EBOM-v4 EQc5:Daylight and quality viewsposted by Omar Elrawy on
We have a huge manufacturing facility, in which taking daylight measurements on 3m grid results in 400+ measurement points, which the client do not afford (cost and time wise), so is there any acce