Forum quick links
Minimum Requirement for Bicycle Facilities Credit
NC-v4 LTc6:Bicycle facilitiesposted by Nuttanee Vongveeranonchai on
Dear All,
Weatherproofing Barrier Primer
NC-v4.1 EQc2:Low-Emitting Materialsposted by Diana Smiciklas on
Hello there,
New Retail space in an existing mall
Retail-CI-v4 LTc5:Reduced parking footprintposted by BEE Incorporations on
We are designing a retail space that is evaluating this credit. The retail space is in a mall which has designated parking area for store employees only.
Database fro CDPH Emission Testing compliant materials
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
Where can I find a database fro CDPH Emission Testing compliant materials?
LEED v4.1, ARC and Minimum Requirement Entries
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Ann Gallogly on
I'm a first time LEED project coordinator using the ARC platform to recertify a Existing Building O+M project.
Ventilation of parking garages
CS-v4 EAp2:Minimum energy performanceposted by Sarah Leenknegt on
Hi
Tenant lighting savings with local code (T24) requirements
CS-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
Is it possible to claim tenant lighting savings due to local code requirements, without a signed tenant lease agreement?
Interior Cross-Contamination Prevention - Elevator lobbies
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by MARCIO OROFINO on
Dear everyone,
We are working on a office building project and pursuing the option 1, and therefore we have to comply with strategie B: Interior Cross-Contamination Prevention.
AHU lighting and convenience Receptacle
NC-v4 EAc3:Advanced energy meteringposted by Mike oliva on
We are needing some help w/ the finer details of metering and complying with the requirements of this credit but also trying to be rational about the extent we need to go for metering the end uses.
LEED for Homes or LEED BD+C?
Homes-v4 MPR3:Must comply with project size requirementsposted by Jalal Avades on
I have an apartment complex with a separate community/leasing building that is about 20% of the total project.