Forum quick links
Baseline - Building Type - Mixed energy supply
NC-v4 EAp2:Minimum energy performanceposted by L on
Hi!
Is a Large Multi-Gender Restroom a "Shared Multi-Occupant Space"?
NC-v4 EQc6:Interior lightingposted by Douglas Flandro on
Does a large multi-gender restroom count as a shared multi-occupant space requiring three lighting levels?
Can a regional soil be the reference soil instead of the existing soil on the site
CS-v4 SSc2:Site development - protect or restore habitatposted by Hanna Oberg on
We have a project with existing green areas.
Poor Cell Phone Service in LEED Buildings?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Dennis Carlberg on
I have heard that the low-E coatings on windows has been found to block cellular phone singals and make many LEED certified buildings "dead zones" for wireless service.
System 3 Heating source
NC-v4.1 EAp2:Minimum Energy Performanceposted by Davide Liviero on
Hello everyone,
Baseline HVAC System Selection
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
I am working on a 9 storey office building (8 levels of office and 1 basement level). The building has a total floor area of 9,400m2.
Waste Diversion
NC-2009 MRc2:Construction Waste Managementposted by Susan Di Giulio on
Hello,
If our project is using Green Halo systems to manage our wastemanagement, do we need to
submit all the back up documentation for the commingled items?
Any recommendations for consultants who specialize in the expanded concept of Universal Design?
posted by Kristen Fritsch on
I am looking for anyone that specializes in this area, see the principles below.
http://universaldesign.ie/What-is-Universal-Design/