Topic | Recent |
---|---|
Pilot Credit: Prevention Through Design CommentPilot-Credits IPpc93: Prevention through designposted by Afogreen Build on May 30, 2024, 12:48 am
To comply with this credit, the project team should fill out the Prevention Through Design worksheet (PtD) for Life Cycle Safety and Health, which is divided into two stages: Operation &... |
|
Group Approach?LEED Rating System Selectionposted by Santiago Avila on May 27, 2024, 10:42 am
Hello everyone, I am currently working on a project consisting of two residential towers (deep retrofit). Although they appear to be connected from the outside, the only connection... Last reply: Glen Boldt, May 29, 2024, 11:51 pm |
|
Products applied offsite and non-Occupied spacesNC-v4.1 EQc2: Low-emitting materialsposted by elias eid on May 28, 2024, 4:31 am
Hi all; I would ask if the products applied offsite such as(paint for steel structural sections, Aluminum profiles, Wooden doors,...) and products applied within non-occupied spaces... Last reply: Andrey Kuznetsov, May 29, 2024, 10:25 pm |
|
Modeling a backup District energy sourceCS-2009 EAp2: Minimum Energy Performanceposted by Florian Pingaud on Dec 9, 2014, 6:41 am
Dear All, I am requesting help on the energy modeling protocol for a building both connected to a stand-alone plant and a... Last reply: Andrey Kuznetsov, May 29, 2024, 9:08 am |
|
Calculations or descriptionsNC-2009 EAc5: Measurement and Verificationposted by Barbara Aguirre Garcia on May 24, 2024, 3:25 pm
For credit, is it necessary to make calculations within the plan, regarding the baseline calculation, the reporting period? Or is it just describing the elements to do the calculations? How is it... Last reply: Marcus Sheffer, May 28, 2024, 12:38 pm |
|
IAQ REPORTSEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Nagaraj Sankar on May 27, 2024, 10:12 pm
Regarding the v4.1 EBOM... |
|
IAQ test reportEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Nagaraj Sankar on May 27, 2024, 2:34 pm
The followingIn one of our project we have met the CO2 and... |
|
Artificial TurfLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Steve Hill on May 24, 2024, 8:51 pm
Please exclude artifical (plastic + forever chemicals) for ground cover. Artifical turf contains a class of chemicals called PFAS.
|
|
Pilot Inclusive DesignPilot-Credits INpc125: Inclusive Designposted by Laurie Johnson on Mar 14, 2024, 2:05 pm
I am working on a LEED CI and WELL at Scale project. I am using an approved C13.1 Accessibility and Universal Design: Integrate Universal Design WELL feature as a crosswalk for the LEED Pilot... Last reply: Bjorn Hansen, May 27, 2024, 3:38 am |
|
Native plants = No Irrigation Required?NC-v4 WEc1: Outdoor water use reductionposted by Yoyo Shek on Jan 24, 2022, 6:40 am
Hi All, Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that:
Last reply: Andrey Kuznetsov, May 26, 2024, 1:16 am |