Forum quick links
How to document the Quality View Simulation Results from IES VE?
CS-v4 EQc5:Quality viewsposted by James Cai on
I have simulated the quality view in the IES VE and created a report according to the simulation results.
Tenancy areas with low relevance
NC-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
Dear All
ENERGY STAR equipment Wattage
CI-v4 EAc2:Optimize energy performanceposted by Michael d on
When inputting ENERGY STAR equipment wattage, do we include the idle, average or maximum wattage used by the equipment?
Extraction point for recycled content
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Jill Kurtz on
In the v3 reference guide, changes were made to clarify recycled content could define "the extraction point for recycled materials is the location of the raw material prior to the manufacturing of
ENERGY STAR equivalent in Australia
CI-v4.1 EAc2:Optimize Energy Performanceposted by Cyrene Lee on
Hi, my project is in Australia and as ENERGY STAR is not used here to rate electrical appliances there are some appliances that have been chosen that are high performing according to our star ratin
Calculation of replacement cost
NC-2009 MRc3:Materials Reuseposted by Adrienn Gelesz on
Hi, When there is some material that was donated, that actually does not appear in the total material cost (no money actually spent).
EMICODE For US project
NC-v4 EQc2:Low emitting materialsposted by Ante Vulin on
We are working on a US project where a subcontractor has submitted an EMICODE EC1 PLUS certificate to show that a sealant complies with the VOC requirements.
I miss you. Come to this Greenbuild wrap-up social event today (11/12, 5:30PM EST)
posted by Jennifer Taranto on
First, special shout out to Carolyn Day from Perkins Eastman for getting permission to use their Pro-zoom account for this Greenbuild wrap-up social session, because...frankly...Greenbuild just was
Resources on Climate Change and Adaptive Architecture
posted by Ramana Koti on
Dear all,