NC-2009 EAc2:On-Site Renewable Energyposted by Paula Hernandez on
Hello, I am working on a Project that wants to claim all the available points on EA-c2.
Building as a teaching tool
NC-v4.1 INc1:Innovationposted by Jon Penndorf on
For a building that is not a K-12 school, can we still pursue the credit for Building as a Teaching Tool using the old credit interpretation? Summarized below.
how to classify our site?
NC-v4.1 SSc2:Protect or Restore Habitatposted by Aynaz Alaei on
Hi,
Does open grass area that was previously re-graded (decades ago) to slope to a man made stormwater retention pond count as greenfield, or is this previously disturbed?
Entryway systems
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by K Pomperada on
Our project is an office building already being occupied by tenants, and the entryway system measures only 9 ft. lacking 1ft from the requirement by LEED.
Congratulations, Cindy Cogil, ASHRAE Fellow!
posted by Kim Shinn on
ASHRAE posted this year's list of honors and right there at the top of the list is our SMEPL colleague, Cindy Cogil - now able to add FASHRAE to her signature block! Well done, Cindy and cong
Chlorine as a biocide treatment
NC-v4.1 WEc3:Optimize Process Water Useposted by Ricardo Sá on
Dear All
Patient Lifts as Medical Furnishings
Healthcare-v4 MRc7:Furniture and medical furnishingsposted by Keith Jensen on
The definition of Medical Furnishings includes "lifting and transfer aids" as examples. It seems to me that patient lifts are medical equipment not medical furnishings.
What Defines "Project Completion"
posted by Lianne Parker on
I have a V4.1 Platinum project in California that is coming to the end of the construction phase. What is considered a "complete" project for USGBC submission?
Why are Light Trespass at almost unreachable light levels?
posted by Kevin Bremer on
So often I am running calculations needing to meet LEED requirements for light tresspass and needing to hit .1FC which is abusurd.