Topic | Recent |
---|---|
Are all spaces outside the 3x head height excluded?NC-v4.1 EQc8: Quality Viewsposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 10, 2024, 9:17 am
I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not... Last reply: Adam McCaughan, Jun 27, 2024, 12:23 pm |
|
Pressurized entryway vestibules at high-volume building entrancesHealthcare-v4 EQc1: Enhanced indoor air quality strategiesposted by Priscillia Champagne on Feb 1, 2021, 8:26 am
Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances. Is there a standard to follow or specific... Last reply: Kai Starn, Jun 27, 2024, 12:19 pm |
|
Heat Island ReductionNC-v4 SSc5: Heat Island Reductionposted by Jose Castorena on Jun 27, 2024, 11:26 am
In this credit under option 1 the standard formula includes a vegetated roof. If our client does not wish to pursue this feature due to perceived maintenance, can we still achieve this credit... Last reply: Deborah Lucking, Jun 27, 2024, 12:05 pm |
|
Flush-out option preferred, but some furniture delivery delayedNC-v4 EQc4: Indoor air quality assessmentposted by Erica Downs on Aug 15, 2019, 11:58 am
The project contractor intends to do a full flush-out prior to occupancy. Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arrive... Last reply: Russ Pellegrino, Jun 27, 2024, 11:48 am |
|
Accessible Open SpacesLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Chantal Carius on May 18, 2024, 7:01 am
Think to have universal accessibility and open space is a big asset, and also to include green roofs and wetlands or ponds. I think it should also have a minimum or native or adapted plant... Last reply: Thomas Lagarde, Jun 27, 2024, 11:12 am |
|
Has anyone received feedback for Path 1- Develop a Standard Green Lease?Pilot-Credits EApc159: Green Leases ACPposted by Kristina K on Apr 21, 2023, 9:48 amLast reply: Talia Fishman, Jun 26, 2024, 1:54 pm |
|
Permeable Paving- "vegetated open space"NC-2009 SSc5.2: Site development - maximize open spaceposted by Lauren Sparandara on Mar 21, 2011, 3:50 pm
If our permeable paving has grass growing through it could that count as both hardscape for SSc7.1 and for vegetated open space in SSc5.2? We aren't achieving SSc2 so we cannot technically... Last reply: Maya Facciolo, Jun 25, 2024, 10:13 pm |
|
District cold storage projectNC-v4 EAp2: Minimum Energy Performanceposted by Ryan Wang on Jun 21, 2024, 2:49 am
Hi all experts, I'm working on 4 cold storage warehouses which all the cooling source form one refrigerating planttoom, i guess i should consider it as the "district cold storage" ,... Last reply: Marcus Sheffer, Jun 25, 2024, 3:27 pm |
|
Reduced Runoff/Rate of Runoff for existing siteNC-2009 SSc6.1: Stormwater design - quantity controlposted by R.L. Bowen on Jun 25, 2024, 11:03 am
Our premilimary review comments for V2009 noted that "Reduction in quantity (SSc6.1) will require stormwater to be infiltrates or re-used onsite. Detaining and releasing runoff... |
|
First public comment draft of LEED v5 BD+C/ID+C: Energy and AtmosphereLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Nadav Malin on Apr 2, 2024, 1:52 pmShare your comments on the first public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere category on this forum. You can either reply to this thread or use the "Post a Question/Comment"... Last reply: Mark Terpstra, Jun 24, 2024, 11:59 am |