Part II is out but LEED Online is not ready for Group project??

LEED Guidance for Campuses and Multiple Buildings
posted by  Marcio Alberto Casado Pereira  on 

Hello, I've ready pretty much everything that is available on AGMBC - the guide itself, forunm, FAQs - but there's so much gray area!

9
Thu Mar 1, 2012, 12:55 am

Level of detail needed in ESC?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Patty Breech  on 

This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 29, 2012, 6:13 pm

pursuing more credits after the performance period.

Performance Period
posted by  Jim Park  on 

I am working on one EB project and it needs of more points to achieve a desired rating.

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Wed Feb 29, 2012, 12:02 am

District Cooling for Humidity Control

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

I am working in a project that has no heating or cooling system, therefore I used the same HVAC system as in the proposed model (system #4: PSZ-HP).

3
Tue Feb 28, 2012, 9:51 pm

Private vs Public Fixtures

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Garrett Billings  on 

I am submitting a LEED CI project in a multi-tenant building and would like to get the points.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 28, 2012, 7:31 pm

Hotel project with multiple buildings

LEED Guidance for Campuses and Multiple Buildings
posted by  Wei Jiang  on 

We are working on a resort project with multiple small buildings each with 2~3 stories. The main building house hotel public and function areas including ballroom, restaurants, ect.

7
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Tue Feb 28, 2012, 3:38 pm

Fuel for district energy and electricity

NC-2009 MRc2:Construction Waste Management
posted by  Tanja Arnesson  on 

Hi, I'm working in Sweden with LEED where we have a different district energy system (very effective and 84% (50% of the people living in Sweden) of the multifamily residents get their heat and ho

8
Default Avatar
LEED BD+C O+M
Carde Ten Architects
LEEDuser Basic Member
74 thumbs up
Mon Feb 27, 2012, 4:18 pm

To include microwaves?

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Simon Ng  on 

Dear All, We are trying to pursue EAc1.4 for our current library proposal.

3
Default Avatar
LEEDuser Basic Member
8 thumbs up
Mon Feb 27, 2012, 2:34 pm

A Learning Center to Support Farming on Prime Farm Land

NC-2009 SSc1:Site Selection
posted by  Brooks Critchfield  on 

We have a project in a rural area sited on an existing farm.

3
Sun Feb 26, 2012, 11:06 pm

LEED boundary question

NC-2009 SSc1:Site Selection
posted by  Mark Meaders  on 

I am working on a project that is being completed in 2 phases. Phase 1 is completed and a certified LEED project.

3
Sustainable Principal
HDR, Inc.
LEEDuser Expert
72 thumbs up
Sun Feb 26, 2012, 10:42 pm