Forum quick links
Part II is out but LEED Online is not ready for Group project??
posted by Marcio Alberto Casado Pereira on
Hello, I've ready pretty much everything that is available on AGMBC - the guide itself, forunm, FAQs - but there's so much gray area!
Level of detail needed in ESC?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Patty Breech on
This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?
pursuing more credits after the performance period.
posted by Jim Park on
I am working on one EB project and it needs of more points to achieve a desired rating.
District Cooling for Humidity Control
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
I am working in a project that has no heating or cooling system, therefore I used the same HVAC system as in the proposed model (system #4: PSZ-HP).
Private vs Public Fixtures
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Garrett Billings on
I am submitting a LEED CI project in a multi-tenant building and would like to get the points.
Hotel project with multiple buildings
posted by Wei Jiang on
We are working on a resort project with multiple small buildings each with 2~3 stories. The main building house hotel public and function areas including ballroom, restaurants, ect.
Fuel for district energy and electricity
NC-2009 MRc2:Construction Waste Managementposted by Tanja Arnesson on
Hi, I'm working in Sweden with LEED where we have a different district energy system (very effective and 84% (50% of the people living in Sweden) of the multifamily residents get their heat and ho
To include microwaves?
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Simon Ng on
Dear All, We are trying to pursue EAc1.4 for our current library proposal.
A Learning Center to Support Farming on Prime Farm Land
NC-2009 SSc1:Site Selectionposted by Brooks Critchfield on
We have a project in a rural area sited on an existing farm.
LEED boundary question
NC-2009 SSc1:Site Selectionposted by Mark Meaders on
I am working on a project that is being completed in 2 phases. Phase 1 is completed and a certified LEED project.