Forum quick links
Unixes Restrooms with Dual Flush Toilets
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Rosenberger on
I see some discussion on the NC2009 forum about this issue but no real resolution.
FSC - Value of Wood
NC-2009 MRc7:Certified Woodposted by matthew convery on
I have a major window supplier that is providing us FSC certified wood windows. They are charging us a $9,500 fee above and beyond the typical window cost for "FSC paperwork".
Carpets and PI Form 5
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Eleni Thomidou on
Hi! In our project there are no carpets in our scope but there might be in the buildouts for tenants spaces.
Signage Requirement
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Erin Cowan on
Is policy verbiage detailing the communication of no-smoking policy by signage strategically throughout a campus acceptable in place of actual drawings or photos?
Existing Computers/ New Computers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Dominique Arrieta on
We have a renovation project at a college where we have a large number of existing computers, monitors and printers that were excluded from the ENERGY STAR calculations.
Other low emission certifications
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mathilda Jonsson on
Hi all! My projects is located in Sweden and therefore many of the flooring products is manufracted here.
Dwelling Units with VRF HVAC system
NC-2009 IEQp1:Minimum IAQ Performanceposted by Katherine Ann Resurreccion on
Hi everyone. Im working on a high rise residential building with VRF system in each unit, located in climate zone 1 so heating is not applicable.
OA requirement for convient store
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jorng-ren Chern on
Currently I am working on a office building project and there is a seven-eleven convient store in the first floor.
Design Engineer
CI-2009 EAp2:Minimum Energy Performanceposted by Noriko Nagazumi on
Lighting system refurbishment, plumbing system refurbishment, rainwater ulilization system installation and purchasing some pieces of Energy Star rated equipment are included within our CI project
Art built in
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jaida Anderson-Lozano on
Our project will have vast amounts of large art installations permanently installed in the building (on the walls, in lobbies, etc).