NC-2009 EAc3: Enhanced Commissioning
posted by Kath Williams on Feb 21, 2010, 1:57 pm

During my workshop last weekend, I posed the question above for discussion. Here was an intense reaction, which I took verbatim from the tape...

The energy modeler, when hired as a...

Last reply: Chris Ladner, Feb 23, 2010, 9:18 am

Soil infiltration

Schools-2009 SSc6.1: Stormwater design - quantity control
posted by Landon Chapman on Feb 23, 2010, 8:42 am

Can someone direct me toward appropriate calculations to determine...

Designated Carpool

Schools-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Ryan Gaylord on Feb 19, 2010, 11:02 am

Yes, the provision of a carpool dropoff area is part of the requirements outlined in SSc4.4 (typically for residential projects). If the project is also pursuing SSc4.3, preferred parking spaces...

Last reply: J W, Feb 22, 2010, 10:20 am

Regularly Occupied

EBOM-2009 IEQc2.4: Daylight and Views
posted by Chris Munn on Feb 19, 2010, 4:52 pm

Does "regularly occupied spaces" exclude vacant tenant spaces? If a floor plan is designed but currently does not have a tenant, couldn't you included the square footage of any private offices...

Last reply: Jenny Carney, Feb 22, 2010, 9:46 am

Regularly Occupied Spaces

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by April Ambrose on Feb 9, 2010, 1:23 pm

In the new LEED Online, under Project Summary templates, the Occupant and Usage Data template, the Space Usage Type Table says the following:

Non-regularly occupied support spaces (e.g...

Last reply: John Beeson, Feb 18, 2010, 9:12 pm

Designated Carpool

Schools-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by J W on Feb 18, 2010, 9:32 am

Our project only has one carpool area and drop off. Does the designated area for fuel efficient vehicles have to be separate?

Cannot afford $$ to obtain CEUs

NC-2009 IDc2: LEED Accredited Professional
posted by Pallab Dasgupta on Feb 17, 2010, 3:02 pm

Please provide a medium resolution downloads for the webinar.

Out of work for 9 months & counting. Also retaking exam is not an inexpensive option for persons from developing countries...

Last reply: Jean Marais, Feb 18, 2010, 5:21 am

List of quirks, bugs and hiccups

Living with LEED Online - quirks, bugs and hiccups
posted by Jean Marais on Feb 18, 2010, 4:23 am

18 Feb 2010
1) Save form with active links only after first loading page. As soon as an edit is made, or page is saved, only printing is possible. After save, reload credit page and save to...

Hotels (w/ conference space), FTE, & water usage rates- SSc4.2?

NC-2009 WEc3: Water Use Reduction
posted by John Beeson on Feb 11, 2010, 6:15 pm

Many CIRs address the issue of...

Last reply: John Beeson, Feb 17, 2010, 3:37 pm

types of metering

NC-2009 EAc5: Measurement and Verification
posted by Elizabeth Warlop on Feb 17, 2010, 9:29 am

Is it true that if you did not do a full building simulation in Credit EA 1: that you would be using Option B? We have a fairly small office building and I am assuming that tthe addition of...

Last reply: Joseph Orr, Feb 17, 2010, 2:55 pm