Log in
Forum
Topic

EA-3

NC-2009 EAc3: Enhanced Commissioning
posted by Shriram Bhide on Mar 2, 2010, 3:52 pm

We are doing a major renovation of a 49,200 gross sf building. According to the LEED 2009 reference guide, EA prerequisite #1, the...

And yes, it sucks that...

Living with LEED Online - quirks, bugs and hiccups
posted by Leticia SooHoo on Mar 2, 2010, 2:09 pm

....the forms are no longer editable off-line. You can't just simply email it to a consultant to have them fill it out and upload.

Living with LEED Online- quirks, bugs and hiccups

Living with LEED Online - quirks, bugs and hiccups
posted by Leticia SooHoo on Mar 2, 2010, 2:01 pm

My experience has been been mixed so far. Agree with the bugs listed above.
Another one I found:
SS4.2...

Light trespass in a parking lot addition

NC-2009 SSc8: Light Pollution Reduction
posted by David Sheridan on Mar 2, 2010, 1:42 pm

My client is expanding an existing building onto an adjacent tract. Our LEED boundary is the interface between the new and existing buildings, extended across what was an existing parking lot....

Roofing Materials

EBOM-2009 MRc3: Sustainable purchasing - facility alterations and additions
posted by Chris Munn on Feb 16, 2010, 10:41 am

If replacing a rock-ballasted roof with an ENERGY STAR rated roof membrane, would you include all the roofing materials (including ENERGY STAR rated membrane, insulation, adhesives) into the MR...

Last reply: Jenny Carney, Mar 2, 2010, 1:26 pm

RECs providers...

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by Jared Silliker on Jan 26, 2010, 2:30 am

In researching RECs options, a municipal utility has a purchasing program that is not itself...

Last reply: Lana Malone, Mar 2, 2010, 1:20 pm

Energy rates for energy analysis

NC-2009 EAc1: Optimize Energy Performance
posted by paul martin on Mar 1, 2010, 12:09 pm

What level of detail is required for energy calcs in regards to utility rates? For example, most utility energy charges are now fluctuating daily for both gas and electric. Some rates,...

Last reply: Clark Denson, Mar 2, 2010, 12:10 pm

Divisions 31 and 32 should be included

General forums
posted by Tristan Roberts on Mar 1, 2010, 11:42 am

Are you referring to a LEED Online sample template or a LEEDuser sample provided here on this site? If the latter, I'd like to correct it if it's off.

The materials cost calculations for...

Last reply: Tristan Roberts, Mar 1, 2010, 2:21 pm

ID Credits under 2009 CI

CI-2009 SSc2: Development Density and Community Connectivity
posted by Rona Easton on Mar 1, 2010, 12:38 pm

Shannon, what do you think about attempting an ID credit for alternative transportation? I have a feeling this might be easier to attempt.

Last reply: Shannon Gray , Mar 1, 2010, 1:03 pm

Pressure of faucets

NC-2009 WEp1: Water Use Reduction
posted by Claudia Rieger on Feb 26, 2010, 11:25 am

Hi everybody,
I´ve already filled out the template, but I´ve a doubt. In the design building we have installed faucet with a min pressure of 7.25 psi, max pressure of 21.76 psi and 1.59 gpm...

Last reply: Bill Swanson, Feb 26, 2010, 3:37 pm