Forum » CS-2009 EAp2
Topic

compliance with ASHRAE 90.1 2007

CS-2009 EAp2: Minimum Energy Performance
posted by shashank jain on Jan 10, 2013, 6:05 am

In order to fulfil the requirements of EAp2 through building simulation, do we need to meet mandatory requirements of ASHRAE 90.1 2007. We feel that meeting recommended building envelope U/R...

Last reply: Marcus Sheffer, Jan 10, 2013, 10:26 am

Mandatory provision 6.4.1.1 Equipment efficiency.

CS-2009 EAp2: Minimum Energy Performance
posted by Sandra Holmström on Jan 10, 2013, 3:05 am

I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2. The retail centre will be heated and...

Last reply: Marcus Sheffer, Jan 10, 2013, 10:18 am

WWR calculation- green wall- lattice

CS-2009 EAp2: Minimum Energy Performance
posted by Ron Dean on Aug 15, 2012, 6:51 pm

Hi all!

I’m modeling a 49-story building with 7 basements, and it has over 40 % (about 85 %) of its envelope covered with glazing, so I have a doubt about the calculation on the Window to...

Last reply: Marcus Sheffer, Jan 8, 2013, 3:42 pm

Equipment discrepancy for Owner's project requirements vs. Model

CS-2009 EAp2: Minimum Energy Performance
posted by charles bell on Dec 12, 2012, 2:35 pm

Our Campus Application CS mixed use/office project uses a common HVAC (district energy) system. The Owner's program required 100 s.f. per ton for the retail areas and 300 s.f. per ton for...

Last reply: Marcus Sheffer, Dec 12, 2012, 4:57 pm

9.4.1.1 mandatories for CS

CS-2009 EAp2: Minimum Energy Performance
posted by Katherine Ann Resurreccion on Dec 7, 2012, 1:42 am

Hi everyone!

If the project...

Last reply: Katherine Ann Resurreccion, Dec 11, 2012, 6:47 pm

how i need to model that to comply with model actual equipment a

CS-2009 EAp2: Minimum Energy Performance
posted by Ron Dean on Nov 28, 2012, 4:13 pm

There is a fan system that will supply outdoor air for the building, This system is a big injection fan that will supply air to all zones that is completed designed and all the zones that are not...

Last reply: Marcus Sheffer, Dec 3, 2012, 12:25 pm

Doubt about climatic zone outside US

CS-2009 EAp2: Minimum Energy Performance
posted by Elodie DUMAS on Nov 15, 2012, 3:58 am

Hi all

We work on a office project at Marseille France with the Leed CS 2009 ; According to
- Table B-3 International Climate Zones Ashrae 90.1 2007 : Marseille / France is located...

Last reply: Marcus Sheffer, Nov 20, 2012, 10:15 am

Per area or Per linear meter requirement?

CS-2009 EAp2: Minimum Energy Performance
posted by Katherine Ann Resurreccion on Nov 14, 2012, 3:46 am

Our project proposed to install facade lighting system. They will use a linear tube...

Last reply: Marcus Sheffer, Nov 19, 2012, 11:40 am

Lighting density in Shopping Centre mall areas

CS-2009 EAp2: Minimum Energy Performance
posted by Ricardo Sá on Nov 8, 2012, 2:29 pm

According to ASHRAE 90.1, power allowance for lighting in mall areas is 18 W/m2 (table 9.6.1).
However, according to section 9.6.2 of ASHRAE 90.1, an additional lighting power of 10,8 W/m2...

Last reply: Ricardo Sá, Nov 13, 2012, 10:31 am

Tenant lighting exceeds ASHRAE, how to model?

CS-2009 EAp2: Minimum Energy Performance
posted by Aaron Yorke on Nov 5, 2012, 2:50 am

Hello all,

In LEED - CS office projects, since the tenant fitout is unknown,...

Last reply: Marcus Sheffer, Nov 5, 2012, 12:32 pm