Forum quick links
User group for an added separate ADA restroom
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Susann Geithner on
Our project is the remodeling of an office space with existing restrooms, which will be equipped with new fixtures and we had to add a restroom with one toilet for ADA compliance.
Energy Model
CS-2009 EAc1:Optimize Energy Performanceposted by Oliver Preuss Hernandez on
Hi, I am about to start to model a Building which includes a Ventilated Facade. But I don't have any idea how to represent it on the simulation program.
Template link to Tier III pesticides not sufficient
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Geoffrey Tomlinson on
FYI, We were just denied the IPM credit using the LEEDuser template because it only included a link to the City of San Francisco’s Hazard Tier 3 least-toxic pesticides.
Parking Capacity
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by VITAL DAFNE on
I am working on a hotel with two separate buildings. Since the parking will be used for the same hotel, the local zoning requirements were met.
Energy Performance after LEED Award
NC-2009 EAp2:Minimum Energy Performanceposted by Steven Er on
In MPR, all LEED certified project must commit to sharing with USGBC and/or GBCI all available actual whole-project energy data for a period of a least 5 year. I assume building energy performance
Rapidly Renewable Lubricants
NC-2009 MRc6:Rapidly Renewable Materialsposted by Mike Woodfall on
How does a supplier of elevator hydraulic fluids document and communicate the renewable nature of our products to contractors interested in NC2009 MRc6 credits?
ESC PLAN Language
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Esteban Undurraga on
Dear all, I think this question will be useful for people doing LEED outside the US.. Is it posible to upload the ESC plan in SPANISH? or I have to translate the whole document to English??
U-factor residential/nonresidential
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I’m modeling a hotel (5 storey, one floor is underground) in which there are also offices, a coffee bar, a wellness center...
Recertification Guidance
posted by Chris Munn on
Is the USGBC ever going to release guidance on recertification? I've been told for over a year and a half now to sit tight, because recertification guidance is on the way.