Log in
Forum
Topic

Building eyebrows count towards area?

NC-2009 SSc7.2: Heat island effect - roof
posted by Nicole Kimoto on Jun 18, 2013, 8:06 pm

up June 18, 2013- 8:38 pm I'm sorry, I see conflicting explanations of how to determine the area of a pitched roof on this forum page. "Roof area" says "as measured when prjoected...

Last reply: Summer Minchew, May 14, 2018, 5:40 pm

Modelling Basement Parking

NC-2009 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Jun 19, 2013, 10:58 am

I'am modelling a building with 2 levels of underground parking, which is unconditioned, opened to the outdoor, and having 4 fans (2 supply and 2 exhaust), while the exhaust fans are DCV's based...

Last reply: Marcus Sheffer, Apr 30, 2014, 9:37 am

Theater Space

Schools-2009 IEQc8.1: Daylight and views - daylight
posted by Adam Rustige on Jun 22, 2013, 12:31 pm

Hello,
I'm working on a Auditorium and classroom addition for a High School. I have to use Option 3 and want to get clarification on the theater space. On page 559 it states "...

Last reply: TODD REED, Nov 24, 2014, 1:52 pm

Surprised

General forums
posted by Melissa Wrolstad on Jul 2, 2013, 4:01 pm

Everyone I know that read the v4 draft from cover to cover voted against it. I wonder what percentage of the 86% actually read the LEED v4 drafts before voting, because there are some pretty...

Last reply: John Casana, Jul 8, 2013, 3:13 pm

Final Design Review- Language issue

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Gaston Michaud on Jul 16, 2013, 6:49 pm

We just received the response of the final design review and the Enhanced Commissioning Credit was denied since the contract that describes the scope of work and the completion date is in Spanish...

Last reply: Flora Qiu, May 4, 2014, 12:13 am

*sensationalism alert*!

General forums
posted by Kathryn West on Aug 27, 2013, 4:26 pm

This is a very helpful and detailed article. A LEED rating system can never ban something for all projects via a *credit*; it would have to be banned via a *prerequisite*, as discussed in the...

Last reply: joel longstreth, Aug 1, 2016, 4:56 pm

Baseline System 1 Pump Energy

NC-2009 EAp2: Minimum Energy Performance
posted by Wes Lawson on Sep 6, 2013, 5:05 pm

We are putting together a baseline of a high rise residential building. In Appendix G, it states that we need to use 19 w/gpm. However, in the commentary, it states that this is based off of 60...

Last reply: Jean Marais, Sep 10, 2013, 10:00 am

FSC Particleboard

Healthcare-v2009 MRc3: Sustainably sourced materials and products
posted by Catherine Blakemore on Sep 16, 2013, 1:12 pm

Is it possible to get...

Last reply: Catherine Blakemore, Sep 18, 2013, 11:11 am

Load calculation and system selection

NC-2009 IEQc7.1: Thermal comfort - design
posted by Jatuwat Varodompun on Sep 17, 2013, 6:17 pm

We got the comment as follow:
"However, the supporting documentation to confirm that all design conditions fall within the ASHRAE 55-2004 acceptable ranges has not been provided as required...

Last reply: Julia Weatherby, Sep 26, 2013, 10:55 am

Low flow pre rinse spray valve in Europe

General forums
posted by Charline SEYTIER on Oct 3, 2013, 4:21 am

EUROPE: Pre-rinse spray valve 1.6gpm or lower

Our project is an office bldg with a Kitchen Restaurant in Europe.
We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower...

Last reply: Charline SEYTIER, Apr 14, 2014, 8:44 am