Topic | Recent |
---|---|
Licensed Professional Exemption (LPE)General forumsposted by Tristan Roberts on May 17, 2010, 3:04 pm
The Licensed Professional Exemption is basically a streamlined documentation path that is available for certain credits, particularly design-oriented credits where a licensed professional such as... Last reply: Susan Di Giulio, Jun 12, 2021, 5:43 pm |
|
Energy CostNC-2009 EAc1: Optimize Energy Performanceposted by Mike Decoster on May 25, 2010, 2:28 pm
We are working on a project with a modelled energy savings of 47% when comparing BTU/sf/yr. When we calculate it as LEED requires (in terms of dollars) our building energy efficiency drops to 22... Last reply: Marcus Sheffer, Apr 11, 2012, 9:32 am |
|
M&V case 2: System required to be monitored not installedCI-2009 EAc3: Measurement and Verificationposted by Edwin Wealend on Jun 7, 2010, 10:14 pm
Hi, We have a project where we are converting a warehouse into an office, it will have a site area > 75% of the building area, infact the whole... Last reply: Luis Miguel Diazgranados, Jan 30, 2012, 10:18 am |
|
"New Wood"CI-2009 MRc7: Certified Woodposted by Lida Lewis on Jun 11, 2010, 7:18 am
I have been informed by a General Contractor who has a lot of LEED construction experience that substrates such as... Last reply: Doug Pierce, AIA, Aug 18, 2010, 11:35 am |
|
Existing LIghting- Commercial InteriorCI-2009 EAp2: Minimum Energy Performanceposted by John Bauer on Jun 13, 2010, 6:35 am
We are doing a fit-out for 1 floor in an existing building in China. The Shell and Core installation provided by the landlord includes the lighting fixtures. So my question is if this existing... Last reply: Billy Ng, Mar 29, 2011, 3:41 am |
|
Energy Star classification for Convention CentersEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Jarrod Chapman on Jun 17, 2010, 8:46 am
Does anyone have advice or information on how best to classify an existing convention center in the Energy Star Portfolio Manager? We are interested in LEED certification under 2009 EB&OM v3.... Last reply: Jenny Carney, Nov 16, 2010, 3:08 pm |
|
Classroom SinksSchools-2009 WEp1: Water Use Reductionposted by Donald Bonnett on Jun 21, 2010, 12:53 pm
Do classroom sinks, and art room sinks fall under lavatory sinks or are they not included in the baseline caculation. Last reply: Tristan Roberts, Nov 4, 2013, 9:25 pm |
|
blow-out fixturesEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Pablo Fortunato Suarez on Jul 20, 2010, 6:47 amfrom other forum users on this one- anyone else struggled with blowout fixtures? Log in or register to post comments Pablo Fortunato Suarez Principal ESD Consultant/Architect GreenArc Sustainable... Last reply: Pablo Fortunato Suarez, Jan 20, 2011, 1:25 pm |
|
Two SurveysEBOM-2009 IEQc2.1: Occupant comfort - occupant surveyposted by Geoffrey Tomlinson on Jul 26, 2010, 8:51 pm
Does it make sense to conduct the survey twice. Once prior to the performance period and then during the performance period for credit compliance. My concern is that if a lot of problems... Last reply: Dan Ackerstein, Jul 30, 2012, 5:20 pm |
|
75% COMPLIANCE areaEBOM-2009 SSc7.2: Heat island effect - roofposted by Danna Sigal on Aug 30, 2010, 4:36 pm
Our roof is 100% covered with White EPDM material. On top of that material are the HVAC units. There are also a couple of vents and a hatch opening for roof access. All these things add up to... Last reply: Tristan Roberts, Nov 15, 2011, 1:20 pm |