Establishing baseline system

NC-2009 EAc1:Optimize Energy Performance
posted by  Kari Krolikowski  on 

My project consists of the following types of spaces: 1. Office: 2,300 SF 2. Manufacturing / laboratory: 24,055 SF 3. Warehouse: 26,905 SF 4.

5
Default Avatar
Mechanical Engineer
SNC Lavalin
LEEDuser Basic Member
1 thumbs up
Thu Oct 18, 2012, 3:49 pm

Signage Shared?

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Joseph Greene  on 

We are required to designate 12 carpool spaces for our LEED project and plan to install pole mounted signs.

2
Thu Oct 18, 2012, 3:36 pm

G3.1.2.9 and Miscellaneous Exhaust Fan Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Edwards  on 

Section G3.1.2.9 says that baseline "system fan electrical power for supply, return, exhaust, and relief (excluding power to fan-powered VAV boxes) shall be calculated" using the formulas given.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 18, 2012, 3:25 pm

Performance Period

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Paola Figueiredo, Newton Figueiredo  on 

Our team submitted a project demonstrating that the building had its performance period for a specific credit done during one (1) year, although the changes and alterations had been made during two

4
Thu Oct 18, 2012, 3:17 pm

Natural Ventilation - airflow rates

NC-2009 EAc1:Optimize Energy Performance
posted by  Sonia Martini  on 

Hi! The building i need to simulate is naturally ventilated and is located in Italy (climatic zone 4A). Which outdoor air rates must be set in the Baseline and Prosposed Case as natural ventilation

3
Thu Oct 18, 2012, 3:14 pm

Is the new LEED v4 for facilities managers? Are FMs needed?

General forums
posted by  Peter Kimmel  on 

First, I want to congratulate the USGBC on all the progress it has made in developing a more complete tool that more-than-ever reflects what it takes to make a green building.

4
Thu Oct 18, 2012, 2:53 pm

IEQc6 Theater/auditorium controls

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Cristian Wolleter  on 

Hi, we are working on a theater (capacity: 500 people) and we don't know if we should include lighting and HVAC controls for the audience.

2
Thu Oct 18, 2012, 12:41 am

40 CFR

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Bruce Maine  on 

I have noticed in several purchased specifications products, ARCOM for example, a reference to 40 CFR 59, Subpart D (EPA Method 24) as related to VOC content.

2
Wed Oct 17, 2012, 5:06 pm

Relocation

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Kath Williams  on 

If you move a core and shell to a new location, it is building reuse or materials reuse?

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Oct 17, 2012, 2:13 pm

Latest lighting control technology

NC-2009 EAc1:Optimize Energy Performance
posted by  David Weigel, PE  on 

Hi all, Mid-design, the building owner has decided to implement the Lutron Quantum system.

5
Wed Oct 17, 2012, 1:53 pm